FINAL CHECK

1.Recheck the specified clearances.

2.Remove all foreign material from the firebox area.

3.Open the primary air draft.

4.Plug the power cord into a 115V AC outlet when using with optional motor. Do no run power cord under unit or in high traffic areas.

5.Place crumpled pieces of newspaper in the stove. Light it and close the door. Ensure that the stove draws properly through the primary draft.

6.Check for smoke leaks around the door.

7.Open the door and check for smoke escaping from the front of the stove. Smoking usually indicates a defective or poorly positioned chimney. Some chimneys with a marginal draft can be preheated by lighting newspaper and holding it near the open damper with a poker or fire tong. Once the chimney heats up, a proper draft can usually be obtained.

If a thorough review of the Troubleshooting Guide in the rear of the manual does not reveal the problem, contact your dealer for assistance.

29

Image 31
Contents BUCKSTOVE Page TABLE OF CONTENTS IMPORTANT INSTRUCTIONS INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL BEFORE INSTALLING YOUR NEW BUCK STOVEINTRODUCTION SECTIONSECTION MASONRY INSERT INSTALLATIONMINIMUM CLEARANCE MASONRY INSERT MODELINSTALLATION OPTIONS POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION MASONRY INSERT INSTALLATIONOPTION B AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROR WIRE IT OPEN OPTION AMOUNTING THE TRIM PANELS INSTALLATION PROCEDUREPOSITIONING THE HEATER POSITIONINGFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION SECTION RESIDENTIAL FREESTANDING INSTALLATIONheater to the remainder of the home Floor Protection ChimneyDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance COLLAR Alcove Installation ClearancesFINAL CHECK CLEARANCES FOR MODEL RESIDENTIAL / MOBILE HOME MINIMUM CLEARANCES TO COMBUSTIBLESCLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLES CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDSDOUBLE WALL OR SHIELDED SINGLE WALL CLEARANCES FOR MODELInstallation of Close Clearance Shields Optional B H C CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLEOR SHIELDED SINGLE WALL CONNECTOR WITH CLOSE CLEARANCE SHIELDSFLOOR PROTECTION SECTION FREESTANDING MOBILE HOME INSTALLATIONPREPARING THE HEATER FOR INSTALLATION TOOLS FOR INSTALLATIONCHIMNEY PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page 1.Recheck the specified clearances FINAL CHECKSECTION WOOD HEATER SAFETY BUILDING A FIRE SECTION OPERATIONPOSSIBLE CAUSE SECTION TROUBLESHOOTINGPROBLEM SOLUTIONSOLUTION PROBLEMPOSSIBLE CAUSE PRODUCTS COVERED WARRANTY TIME PERIODSPROCEDURE NEW BUCK CORPORATION NBCOTHER RIGHTS CONDITIONS AND EXCLUSIONS