New Buck Corporation 74 installation instructions Final Check, Recheck the specified clearances

Page 31
Image 31
Contents BUCKSTOVE Page TABLE OF CONTENTS IMPORTANT INSTRUCTIONS INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL BEFORE INSTALLING YOUR NEW BUCK STOVEINTRODUCTION SECTIONSECTION MASONRY INSERT INSTALLATIONMINIMUM CLEARANCE MASONRY INSERT MODELINSTALLATION OPTIONS POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION MASONRY INSERT INSTALLATIONOPTION B AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROR WIRE IT OPEN OPTION AMOUNTING THE TRIM PANELS INSTALLATION PROCEDUREPOSITIONING THE HEATER POSITIONINGFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION SECTION RESIDENTIAL FREESTANDING INSTALLATIONheater to the remainder of the home Floor Protection ChimneyDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance COLLAR Alcove Installation ClearancesFINAL CHECK CLEARANCES FOR MODEL RESIDENTIAL / MOBILE HOME MINIMUM CLEARANCES TO COMBUSTIBLESCLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLES CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDSDOUBLE WALL OR SHIELDED SINGLE WALL CLEARANCES FOR MODELInstallation of Close Clearance Shields Optional B H C CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLEOR SHIELDED SINGLE WALL CONNECTOR WITH CLOSE CLEARANCE SHIELDSFLOOR PROTECTION SECTION FREESTANDING MOBILE HOME INSTALLATIONPREPARING THE HEATER FOR INSTALLATION TOOLS FOR INSTALLATIONCHIMNEY PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page 1.Recheck the specified clearances FINAL CHECKSECTION WOOD HEATER SAFETY BUILDING A FIRE SECTION OPERATIONPOSSIBLE CAUSE SECTION TROUBLESHOOTINGPROBLEM SOLUTIONSOLUTION PROBLEMPOSSIBLE CAUSE PRODUCTS COVERED WARRANTY TIME PERIODSPROCEDURE NEW BUCK CORPORATION NBCOTHER RIGHTS CONDITIONS AND EXCLUSIONS