New Buck Corporation 74 installation instructions Buckstove

Page 1
BUCKSTOVE

BUCKSTOVE

Image 1
Contents BUCKSTOVE Page TABLE OF CONTENTS MAINTENANCE INSTRUCTIONS MODEL INSTALLATION, OPERATION, ANDBEFORE INSTALLING YOUR NEW BUCK STOVE IMPORTANT INSTRUCTIONSINTRODUCTION SECTIONMINIMUM CLEARANCE MASONRY INSERT MASONRY INSERT INSTALLATIONMODEL SECTIONINSTALLATION PREPARATION POSSIBLE TOOLS NEEDED FOR INSTALLATIONMASONRY INSERT INSTALLATION INSTALLATION OPTIONSOR WIRE IT OPEN AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROPTION A OPTION BPOSITIONING THE HEATER INSTALLATION PROCEDUREPOSITIONING MOUNTING THE TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION SECTION RESIDENTIAL FREESTANDING INSTALLATIONheater to the remainder of the home Floor Protection ChimneyDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance COLLAR Alcove Installation ClearancesFINAL CHECK CLEARANCES FOR MODEL RESIDENTIAL / MOBILE HOME MINIMUM CLEARANCES TO COMBUSTIBLESCLEARANCES FOR MODEL DOUBLE WALL OR SHIELDED SINGLE WALL CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDSCLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLESInstallation of Close Clearance Shields Optional OR SHIELDED SINGLE WALL CONNECTOR CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLEWITH CLOSE CLEARANCE SHIELDS B H CFLOOR PROTECTION SECTION FREESTANDING MOBILE HOME INSTALLATIONPREPARING THE HEATER FOR INSTALLATION TOOLS FOR INSTALLATIONCHIMNEY PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page 1.Recheck the specified clearances FINAL CHECKSECTION WOOD HEATER SAFETY BUILDING A FIRE SECTION OPERATIONPROBLEM SECTION TROUBLESHOOTINGSOLUTION POSSIBLE CAUSESOLUTION PROBLEMPOSSIBLE CAUSE PROCEDURE WARRANTY TIME PERIODSNEW BUCK CORPORATION NBC PRODUCTS COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS