New Buck Corporation 74 installation instructions

Page 2
Image 2
Contents BUCKSTOVE Page TABLE OF CONTENTS BEFORE INSTALLING YOUR NEW BUCK STOVE INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL IMPORTANT INSTRUCTIONSSECTION INTRODUCTIONMODEL MASONRY INSERT INSTALLATIONMINIMUM CLEARANCE MASONRY INSERT SECTIONMASONRY INSERT INSTALLATION POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION INSTALLATION OPTIONSOPTION A AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROR WIRE IT OPEN OPTION BPOSITIONING INSTALLATION PROCEDUREPOSITIONING THE HEATER MOUNTING THE TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION heater to the remainder of the home SECTION RESIDENTIAL FREESTANDING INSTALLATIONPREPARING THE STOVE FOR INSTALLATION Chimney Floor ProtectionDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance Alcove Installation Clearances COLLARFINAL CHECK CLEARANCES FOR MODEL CLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLESRESIDENTIAL / MOBILE HOME CLEARANCES FOR MODEL CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDSDOUBLE WALL OR SHIELDED SINGLE WALL MINIMUM CLEARANCES TO COMBUSTIBLESInstallation of Close Clearance Shields Optional WITH CLOSE CLEARANCE SHIELDS CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLEOR SHIELDED SINGLE WALL CONNECTOR B H CSECTION FREESTANDING MOBILE HOME INSTALLATION FLOOR PROTECTIONCHIMNEY TOOLS FOR INSTALLATIONPREPARING THE HEATER FOR INSTALLATION PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page FINAL CHECK 1.Recheck the specified clearancesSECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRESOLUTION SECTION TROUBLESHOOTINGPROBLEM POSSIBLE CAUSEPOSSIBLE CAUSE PROBLEMSOLUTION NEW BUCK CORPORATION NBC WARRANTY TIME PERIODSPROCEDURE PRODUCTS COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS