New Buck Corporation 74 installation instructions Preparing The Location For Room Heater

Page 28
Image 28
Contents BUCKSTOVE Page TABLE OF CONTENTS INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MODELBEFORE INSTALLING YOUR NEW BUCK STOVE IMPORTANT INSTRUCTIONSSECTION INTRODUCTIONMASONRY INSERT INSTALLATION MINIMUM CLEARANCE MASONRY INSERTMODEL SECTIONPOSSIBLE TOOLS NEEDED FOR INSTALLATION INSTALLATION PREPARATIONMASONRY INSERT INSTALLATION INSTALLATION OPTIONSAIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPER OR WIRE IT OPENOPTION A OPTION BINSTALLATION PROCEDURE POSITIONING THE HEATERPOSITIONING MOUNTING THE TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION SECTION RESIDENTIAL FREESTANDING INSTALLATIONheater to the remainder of the home Chimney Floor ProtectionDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance Alcove Installation Clearances COLLARFINAL CHECK CLEARANCES FOR MODEL RESIDENTIAL / MOBILE HOME MINIMUM CLEARANCES TO COMBUSTIBLESCLEARANCES FOR MODEL CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDS DOUBLE WALL OR SHIELDED SINGLE WALLCLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLESInstallation of Close Clearance Shields Optional CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLE OR SHIELDED SINGLE WALL CONNECTORWITH CLOSE CLEARANCE SHIELDS B H CSECTION FREESTANDING MOBILE HOME INSTALLATION FLOOR PROTECTIONPREPARING THE HEATER FOR INSTALLATION TOOLS FOR INSTALLATIONCHIMNEY PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page FINAL CHECK 1.Recheck the specified clearancesSECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRESECTION TROUBLESHOOTING PROBLEMSOLUTION POSSIBLE CAUSESOLUTION PROBLEMPOSSIBLE CAUSE WARRANTY TIME PERIODS PROCEDURENEW BUCK CORPORATION NBC PRODUCTS COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS