PREPARING THE LOCATION FOR ROOM HEATER

PREPARING THE LOCATION FOR ROOM HEATER

1.Select an installation location that will give the best airflow from the front of the heater to the remainder of the home.

2.Placetheprotectivefloorpadin position. For minim floor protection (See Pages 12,20,21,23.)

3.Place the unit on the pad making sure the minimumum clearance specifications are met.

4.Lightly mark with a pencil the location of the pedestal on the protective pad.

5.Next, remove the four (4) screws holding the heater to the stand. Position heater out of the way of the installation area.

6.Check that the pedestal stand is still aligned with the marks on the protective pad, now mark the outside air opening in bottom of pedestal stand on to the pad.

7.Next, mark the center line of the outside air opening. Set stand aside for now.

8.Next, cut a 4 1/4" diameter hole in the pad and continue through the floor.

9.Now, reposition the pedestal stand and set on the pad being sure to line the stand up with the reference marks.

10.Using an electric drill and 3/8" masonry bit, drill four (4) holes in the protective pad using the holes in the bottom side lips of the pedestal stand as a guide. Be careful to drill only through the pad and not into the floor. Change the bit to a 1/4" metal bit and drill through the floor.

11.Using the four (4) 3/8" x 1-1/2" lag bolts provided, secure the pedestal stand and pad to the floor of the mobile home.

12.Set the heater back onto the stand and resecure using the screws.

13.Obtain the outside air duct from the box in the pedestal kit marked FA P21B.

26

Image 28
Contents BUCKSTOVE Page TABLE OF CONTENTS INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MODELBEFORE INSTALLING YOUR NEW BUCK STOVE IMPORTANT INSTRUCTIONSSECTION INTRODUCTIONMASONRY INSERT INSTALLATION MINIMUM CLEARANCE MASONRY INSERTMODEL SECTIONPOSSIBLE TOOLS NEEDED FOR INSTALLATION INSTALLATION PREPARATIONMASONRY INSERT INSTALLATION INSTALLATION OPTIONSAIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPER OR WIRE IT OPENOPTION A OPTION BINSTALLATION PROCEDURE POSITIONING THE HEATERPOSITIONING MOUNTING THE TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION SECTION RESIDENTIAL FREESTANDING INSTALLATIONheater to the remainder of the home Chimney Floor ProtectionDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance Alcove Installation Clearances COLLARFINAL CHECK CLEARANCES FOR MODEL RESIDENTIAL / MOBILE HOME MINIMUM CLEARANCES TO COMBUSTIBLESCLEARANCES FOR MODEL CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDS DOUBLE WALL OR SHIELDED SINGLE WALLCLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLESInstallation of Close Clearance Shields Optional CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLE OR SHIELDED SINGLE WALL CONNECTORWITH CLOSE CLEARANCE SHIELDS B H CSECTION FREESTANDING MOBILE HOME INSTALLATION FLOOR PROTECTIONPREPARING THE HEATER FOR INSTALLATION TOOLS FOR INSTALLATIONCHIMNEY PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page FINAL CHECK 1.Recheck the specified clearancesSECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRESECTION TROUBLESHOOTING PROBLEMSOLUTION POSSIBLE CAUSESOLUTION PROBLEMPOSSIBLE CAUSE WARRANTY TIME PERIODS PROCEDURENEW BUCK CORPORATION NBC PRODUCTS COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS