New Buck Corporation 74 Minimum Clearances To Combustibles, Residential / Mobile Home

Page 22
MINIMUM CLEARANCES TO COMBUSTIBLES

CLEARANCES FOR MODEL 74

MINIMUM CLEARANCES TO COMBUSTIBLES

RESIDENTIAL / MOBILE HOME

DOUBLE WALL OR SHIELDED SINGLE WALL CONNECTOR WITH CLOSE CLEARANCE SHIELDS

 

 

BACK WALL

 

C

B

BH C FF

 

WALLSIDE

 

CD

D

 

 

 

 

 

 

E

G

 

 

A

 

 

Figure 10

MODEL

A

B

C

D

E

F

G

H

MODEL 74

23"

4"

6.5"

4"

8"

6"

20"

10”

NOTE: All clearances are to combustibles with all low

clearance shields and double wall

pipe and minimum floor protector.

 

 

 

 

 

 

 

20

Image 22
Contents BUCKSTOVE Page TABLE OF CONTENTS BEFORE INSTALLING YOUR NEW BUCK STOVE INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL IMPORTANT INSTRUCTIONSSECTION INTRODUCTIONMODEL MASONRY INSERT INSTALLATIONMINIMUM CLEARANCE MASONRY INSERT SECTIONMASONRY INSERT INSTALLATION POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION INSTALLATION OPTIONSOPTION A AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROR WIRE IT OPEN OPTION BPOSITIONING INSTALLATION PROCEDUREPOSITIONING THE HEATER MOUNTING THE TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION SECTION RESIDENTIAL FREESTANDING INSTALLATIONheater to the remainder of the home Chimney Floor ProtectionDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance Alcove Installation Clearances COLLARFINAL CHECK CLEARANCES FOR MODEL RESIDENTIAL / MOBILE HOME MINIMUM CLEARANCES TO COMBUSTIBLESCLEARANCES FOR MODEL CLEARANCES FOR MODEL CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDSDOUBLE WALL OR SHIELDED SINGLE WALL MINIMUM CLEARANCES TO COMBUSTIBLESInstallation of Close Clearance Shields Optional WITH CLOSE CLEARANCE SHIELDS CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLEOR SHIELDED SINGLE WALL CONNECTOR B H CSECTION FREESTANDING MOBILE HOME INSTALLATION FLOOR PROTECTIONPREPARING THE HEATER FOR INSTALLATION TOOLS FOR INSTALLATIONCHIMNEY PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page FINAL CHECK 1.Recheck the specified clearancesSECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRESOLUTION SECTION TROUBLESHOOTINGPROBLEM POSSIBLE CAUSESOLUTION PROBLEMPOSSIBLE CAUSE NEW BUCK CORPORATION NBC WARRANTY TIME PERIODSPROCEDURE PRODUCTS COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS