New Buck Corporation 74 Installation, Operation, And, Maintenance Instructions Model

Page 4
INSTALLATION, OPERATION, AND

INSTALLATION, OPERATION, AND

MAINTENANCE INSTRUCTIONS

MODEL 74

BEFORE INSTALLING YOUR NEW BUCK STOVE,

READ THE ENTIRE INSTRUCTION MANUAL

IMPORTANT INSTRUCTIONS

The New Buck Corp. non-catalytic Model 74 has been tested by ITS, Warnock Hersey to ANSI/UL Standards 1482.

Install and operate your unit according to instructions provided in this manual. Local building codes may apply; therefore, contact your local building inspector or fire marshal for necessary installation requirements and permits which may go beyond these instructions. Contact your insurance company for coverage and installation inspection.

If MODEL 74 is installed in a mobile home: “DO NOT INSTALL IN SLEEPING ROOMS.”

The Model 74 is approved for use in specified Zero Clearance fireplaces (ZCF’s).

Examine the masonry fireplace and chimney prior to installation of the fireplace accessory to determine that the construction meets the minimum fireplace construction requirements illustrated in the instructions, that it is free from cracks, loose mortar, creosote deposits and other blockage, or other signs of deterioration.

2

Image 4
Contents BUCKSTOVE Page TABLE OF CONTENTS INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MODELBEFORE INSTALLING YOUR NEW BUCK STOVE IMPORTANT INSTRUCTIONSSECTION INTRODUCTIONMASONRY INSERT INSTALLATION MINIMUM CLEARANCE MASONRY INSERTMODEL SECTIONPOSSIBLE TOOLS NEEDED FOR INSTALLATION INSTALLATION PREPARATIONMASONRY INSERT INSTALLATION INSTALLATION OPTIONSAIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPER OR WIRE IT OPENOPTION A OPTION BINSTALLATION PROCEDURE POSITIONING THE HEATERPOSITIONING MOUNTING THE TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION SECTION RESIDENTIAL FREESTANDING INSTALLATIONheater to the remainder of the home Chimney Floor ProtectionDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance Alcove Installation Clearances COLLARFINAL CHECK CLEARANCES FOR MODEL RESIDENTIAL / MOBILE HOME MINIMUM CLEARANCES TO COMBUSTIBLESCLEARANCES FOR MODEL CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDS DOUBLE WALL OR SHIELDED SINGLE WALLCLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLESInstallation of Close Clearance Shields Optional CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLE OR SHIELDED SINGLE WALL CONNECTORWITH CLOSE CLEARANCE SHIELDS B H CSECTION FREESTANDING MOBILE HOME INSTALLATION FLOOR PROTECTIONPREPARING THE HEATER FOR INSTALLATION TOOLS FOR INSTALLATIONCHIMNEY PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page FINAL CHECK 1.Recheck the specified clearancesSECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRESECTION TROUBLESHOOTING PROBLEMSOLUTION POSSIBLE CAUSESOLUTION PROBLEMPOSSIBLE CAUSE WARRANTY TIME PERIODS PROCEDURENEW BUCK CORPORATION NBC PRODUCTS COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS