New Buck Corporation 74 Ceiling Exit Using Close Clearance listed chimney

Page 29
Image 29
Contents BUCKSTOVE Page TABLE OF CONTENTS MAINTENANCE INSTRUCTIONS MODEL INSTALLATION, OPERATION, ANDBEFORE INSTALLING YOUR NEW BUCK STOVE IMPORTANT INSTRUCTIONSINTRODUCTION SECTIONMINIMUM CLEARANCE MASONRY INSERT MASONRY INSERT INSTALLATIONMODEL SECTIONINSTALLATION PREPARATION POSSIBLE TOOLS NEEDED FOR INSTALLATIONMASONRY INSERT INSTALLATION INSTALLATION OPTIONSOR WIRE IT OPEN AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROPTION A OPTION BPOSITIONING THE HEATER INSTALLATION PROCEDUREPOSITIONING MOUNTING THE TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION heater to the remainder of the home SECTION RESIDENTIAL FREESTANDING INSTALLATIONPREPARING THE STOVE FOR INSTALLATION Floor Protection ChimneyDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance COLLAR Alcove Installation ClearancesFINAL CHECK CLEARANCES FOR MODEL CLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLESRESIDENTIAL / MOBILE HOME DOUBLE WALL OR SHIELDED SINGLE WALL CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDSCLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLESInstallation of Close Clearance Shields Optional OR SHIELDED SINGLE WALL CONNECTOR CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLEWITH CLOSE CLEARANCE SHIELDS B H CFLOOR PROTECTION SECTION FREESTANDING MOBILE HOME INSTALLATIONCHIMNEY TOOLS FOR INSTALLATIONPREPARING THE HEATER FOR INSTALLATION PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page 1.Recheck the specified clearances FINAL CHECKSECTION WOOD HEATER SAFETY BUILDING A FIRE SECTION OPERATIONPROBLEM SECTION TROUBLESHOOTINGSOLUTION POSSIBLE CAUSEPOSSIBLE CAUSE PROBLEMSOLUTION PROCEDURE WARRANTY TIME PERIODSNEW BUCK CORPORATION NBC PRODUCTS COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS