New Buck Corporation 74 installation instructions

Page 17
Manual background

3.Measure up so there will be at least 1/4" rise per foot of horizontal connector pipe, maintaining clearances to the ceiling as noted in (Figure 6 Page 14.) This will give you the center of the hole for the chimney penetration.

4.After locating the center of the penetration, install the tee-box and chimney as per the chimney manufacturer's specifications.

5.Connect the chimney connector to the tee-box using #24 ga. minimum blue or black steel connector pipe. DO NOT use galvanized pipe. Connect each section so the crimped end faces downward, and secure each section to each other using three (3) sheet metal screws or rivets. (See Figure 7.)

C. Wall Exit Into Masonry Flue (Using Single Wall Pipe.)

1.Before connecting these units to a masonry chimney, determine that the masonry flue pass-through connector thimble meets the NFPA-211 Code and local building codes and is a minimum of 18" from the ceiling. If the connector thimble does not meet these codes, the pass-through connector must be modified.

CEILING

CENTER LINE

 

OF ELBOW

 

1/4” RISE PER FT’

 

MARK PLUM LINE

 

SECURE WITH (3)

SEAL AROUND PIPE TO

 

SHEET METAL SCREWS

MASONRY

THIMBLE OR PASS-

 

THROUGH CONNECTOR

FLUE

 

WITH NON-COMBUSTIBLE

LINERS

 

MATERIAL

 

 

WALL

 

 

 

CLEAN OUT

FLOOR PROTECTOR

 

DOOR

See Figure 9. Page 19.

 

 

 

 

MASONRY CHIMNEY

Figure 7

15

Image 17
Contents BUCKSTOVE Page TABLE OF CONTENTS MAINTENANCE INSTRUCTIONS MODEL INSTALLATION, OPERATION, ANDBEFORE INSTALLING YOUR NEW BUCK STOVE IMPORTANT INSTRUCTIONSINTRODUCTION SECTIONMINIMUM CLEARANCE MASONRY INSERT MASONRY INSERT INSTALLATIONMODEL SECTIONINSTALLATION PREPARATION POSSIBLE TOOLS NEEDED FOR INSTALLATIONMASONRY INSERT INSTALLATION INSTALLATION OPTIONSOR WIRE IT OPEN AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROPTION A OPTION BPOSITIONING THE HEATER INSTALLATION PROCEDUREPOSITIONING MOUNTING THE TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION heater to the remainder of the home SECTION RESIDENTIAL FREESTANDING INSTALLATIONPREPARING THE STOVE FOR INSTALLATION Floor Protection ChimneyDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance COLLAR Alcove Installation ClearancesFINAL CHECK CLEARANCES FOR MODEL CLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLESRESIDENTIAL / MOBILE HOME DOUBLE WALL OR SHIELDED SINGLE WALL CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDSCLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLESInstallation of Close Clearance Shields Optional OR SHIELDED SINGLE WALL CONNECTOR CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLEWITH CLOSE CLEARANCE SHIELDS B H CFLOOR PROTECTION SECTION FREESTANDING MOBILE HOME INSTALLATIONCHIMNEY TOOLS FOR INSTALLATIONPREPARING THE HEATER FOR INSTALLATION PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page 1.Recheck the specified clearances FINAL CHECKSECTION WOOD HEATER SAFETY BUILDING A FIRE SECTION OPERATIONPROBLEM SECTION TROUBLESHOOTINGSOLUTION POSSIBLE CAUSEPOSSIBLE CAUSE PROBLEMSOLUTION PROCEDURE WARRANTY TIME PERIODSNEW BUCK CORPORATION NBC PRODUCTS COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS