New Buck Corporation 74 installation instructions Problem, Possible Cause, Solution

Page 35

 

 

PROBLEM

 

POSSIBLE CAUSE

SOLUTION

 

2.

High fuel consumption

1.

Improper regulation of

1. (a) Close inlet air control

 

 

 

 

 

draft or inlet air

as much as possible to

 

 

 

 

 

 

maintain desired heat

 

 

 

 

 

 

output.

 

 

 

 

 

 

(b) Check gaskets,

 

 

 

 

 

 

reinstall fiberglass

 

 

 

 

 

 

gasketing around doors

 

 

 

 

 

 

and glass as necessary

 

 

 

 

2.

Improper door fitting

2. Check door gasket,

 

 

 

 

 

 

check adjustment of door

 

 

 

 

 

 

latch

 

 

 

 

 

 

 

 

3.

Backpuffing

1.

Gusts of Wind

1. (a) Smoke shelf in

 

 

 

 

 

 

chimney is filled with

 

 

 

 

 

 

creosote & ash

 

 

 

 

 

 

(b) Chimney may need

 

 

 

 

 

 

wind diverter. Raise

 

 

 

 

 

 

chimney for better draft.

 

 

 

 

 

 

 

 

4.Smoke rollout when heater door is opened

1.Wind gusts blowing down the chimney

1.(a) Smoke shelf in chimney is filled with creosote & ash

(b) Chimney may need wind diverter. Raise chimney for better draft.

2.Opening heater door too fast

2.Crack door for 15 seconds before fully opening door.

33

Image 35
Contents BUCKSTOVE Page TABLE OF CONTENTS IMPORTANT INSTRUCTIONS INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL BEFORE INSTALLING YOUR NEW BUCK STOVEINTRODUCTION SECTIONSECTION MASONRY INSERT INSTALLATIONMINIMUM CLEARANCE MASONRY INSERT MODELINSTALLATION OPTIONS POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION MASONRY INSERT INSTALLATIONOPTION B AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROR WIRE IT OPEN OPTION AMOUNTING THE TRIM PANELS INSTALLATION PROCEDUREPOSITIONING THE HEATER POSITIONINGFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION heater to the remainder of the home SECTION RESIDENTIAL FREESTANDING INSTALLATIONPREPARING THE STOVE FOR INSTALLATION Floor Protection ChimneyDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance COLLAR Alcove Installation ClearancesFINAL CHECK CLEARANCES FOR MODEL CLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLESRESIDENTIAL / MOBILE HOME MINIMUM CLEARANCES TO COMBUSTIBLES CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDSDOUBLE WALL OR SHIELDED SINGLE WALL CLEARANCES FOR MODELInstallation of Close Clearance Shields Optional B H C CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLEOR SHIELDED SINGLE WALL CONNECTOR WITH CLOSE CLEARANCE SHIELDSFLOOR PROTECTION SECTION FREESTANDING MOBILE HOME INSTALLATIONCHIMNEY TOOLS FOR INSTALLATIONPREPARING THE HEATER FOR INSTALLATION PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page 1.Recheck the specified clearances FINAL CHECKSECTION WOOD HEATER SAFETY BUILDING A FIRE SECTION OPERATIONPOSSIBLE CAUSE SECTION TROUBLESHOOTINGPROBLEM SOLUTIONPOSSIBLE CAUSE PROBLEMSOLUTION PRODUCTS COVERED WARRANTY TIME PERIODSPROCEDURE NEW BUCK CORPORATION NBCOTHER RIGHTS CONDITIONS AND EXCLUSIONS