New Buck Corporation 74 installation instructions Final Check

Page 20
FINAL CHECK

FINAL CHECK

1.Recheck the specified clearances.

2.Remove all foreign material from the firebox area.

3.Open the primary air draft.

4.Plug the power cord into a 115V AC outlet when using with optional motor. ”Do not run power cord under unit or in high traffic areas”.

5.Place crumpled pieces of newspaper in the stove. Light it and close the door. Ensure that the stove draws properly through the primary draft.

6.Check for smoke leaks around the door.

If a thorough review of the Troubleshooting Guide in the rear of the manual does not reveal the problem, contact your dealer for assistance.

18

Image 20
Contents BUCKSTOVE Page TABLE OF CONTENTS INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MODELBEFORE INSTALLING YOUR NEW BUCK STOVE IMPORTANT INSTRUCTIONSSECTION INTRODUCTIONMASONRY INSERT INSTALLATION MINIMUM CLEARANCE MASONRY INSERTMODEL SECTIONPOSSIBLE TOOLS NEEDED FOR INSTALLATION INSTALLATION PREPARATIONMASONRY INSERT INSTALLATION INSTALLATION OPTIONSAIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPER OR WIRE IT OPENOPTION A OPTION BINSTALLATION PROCEDURE POSITIONING THE HEATERPOSITIONING MOUNTING THE TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION heater to the remainder of the home SECTION RESIDENTIAL FREESTANDING INSTALLATIONPREPARING THE STOVE FOR INSTALLATION Chimney Floor ProtectionDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance Alcove Installation Clearances COLLARFINAL CHECK CLEARANCES FOR MODEL CLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLESRESIDENTIAL / MOBILE HOME CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDS DOUBLE WALL OR SHIELDED SINGLE WALLCLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLESInstallation of Close Clearance Shields Optional CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLE OR SHIELDED SINGLE WALL CONNECTORWITH CLOSE CLEARANCE SHIELDS B H CSECTION FREESTANDING MOBILE HOME INSTALLATION FLOOR PROTECTIONCHIMNEY TOOLS FOR INSTALLATIONPREPARING THE HEATER FOR INSTALLATION PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page FINAL CHECK 1.Recheck the specified clearancesSECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRESECTION TROUBLESHOOTING PROBLEMSOLUTION POSSIBLE CAUSEPOSSIBLE CAUSE PROBLEMSOLUTION WARRANTY TIME PERIODS PROCEDURENEW BUCK CORPORATION NBC PRODUCTS COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS