New Buck Corporation 74 installation instructions Clearances For Model

Page 21
CLEARANCES FOR MODEL 74

CLEARANCES FOR MODEL 74

MINIMUM CLEARANCES TO COMBUSTIBLES RESIDENTIAL SINGLE WALL CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDS

 

 

BACK WALL

 

 

C

B

BH C

FF

D

 

 

CD

SIDE WALL

 

 

 

 

 

E

 

G

 

 

A

 

 

 

Figure 9

MODEL

A

B

C

D

E

F

G

H

MODEL 74

25"

8"

10.5"

8"

8"

6"

20"

10”

NOTE: All clearances are to combustibles without low clearance shields and using single wall pipe and minimum floor protector. The clearances above may be reduced. Follow NFPA-211codes if available or follow instructions on next page.

19

Image 21
Contents BUCKSTOVE Page TABLE OF CONTENTS MAINTENANCE INSTRUCTIONS MODEL INSTALLATION, OPERATION, ANDBEFORE INSTALLING YOUR NEW BUCK STOVE IMPORTANT INSTRUCTIONSINTRODUCTION SECTIONMINIMUM CLEARANCE MASONRY INSERT MASONRY INSERT INSTALLATIONMODEL SECTIONINSTALLATION PREPARATION POSSIBLE TOOLS NEEDED FOR INSTALLATIONMASONRY INSERT INSTALLATION INSTALLATION OPTIONSOR WIRE IT OPEN AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROPTION A OPTION BPOSITIONING THE HEATER INSTALLATION PROCEDUREPOSITIONING MOUNTING THE TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION SECTION RESIDENTIAL FREESTANDING INSTALLATION PREPARING THE STOVE FOR INSTALLATIONheater to the remainder of the home Floor Protection ChimneyDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance COLLAR Alcove Installation ClearancesFINAL CHECK CLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLES RESIDENTIAL / MOBILE HOMECLEARANCES FOR MODEL DOUBLE WALL OR SHIELDED SINGLE WALL CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDSCLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLESInstallation of Close Clearance Shields Optional OR SHIELDED SINGLE WALL CONNECTOR CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLEWITH CLOSE CLEARANCE SHIELDS B H CFLOOR PROTECTION SECTION FREESTANDING MOBILE HOME INSTALLATIONTOOLS FOR INSTALLATION PREPARING THE HEATER FOR INSTALLATIONCHIMNEY PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page 1.Recheck the specified clearances FINAL CHECKSECTION WOOD HEATER SAFETY BUILDING A FIRE SECTION OPERATIONPROBLEM SECTION TROUBLESHOOTINGSOLUTION POSSIBLE CAUSEPROBLEM SOLUTIONPOSSIBLE CAUSE PROCEDURE WARRANTY TIME PERIODSNEW BUCK CORPORATION NBC PRODUCTS COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS