Heat & Glo LifeStyle SLR (COSMO) Termination Locations, Vent Termination Minimum Clearances

Page 20

6 Termination Locations

A. Vent Termination Minimum Clearances

WARNING

Fire Risk.

Maintain vent clearance to combustibles as specified.

DO NOT pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause overheating and fire.

 

 

HORIZONTAL

 

 

OVERHANG

2 FT.

20 INCHES MIN.

VERTICAL

MIN.

 

 

WALL

 

LOWEST

 

 

 

DISCHARGE

 

 

OPENING

 

GAS DIRECT VENT

 

 

TERMINATION CAP

 

 

 

 

X

 

 

12

 

 

ROOF PITCH

 

 

IS X/ 12

 

H (MIN.) - MINIMUM HEIGHT FROM ROOF

 

TO LOWEST DISCHARGE OPENING

Roof Pitch

 

H (Min.) Ft.

Flat to 6/12...........................................................1.0*

Over 6/12 to 7/12.................................................1.25*

Over 7/12 to 8/12.................................................1.5*

Over 8/12 to 9/12.................................................2.0*

Over 9/12 to 10/12...............................................2.5

Over 10/12 to 11/12 .............................................3.25

Over 11/12 to 12/12 .............................................4.0

Over 12/12 to 14/12.............................................5.0

Over 14/12 to 16/12.............................................6.0

Over 16/12 to 18/12.............................................7.0

Over 18/12 to 20/12.............................................7.5

Over 20/12 to 21/12.............................................8.0

* 3 foot minimum in snow regions

Figure 6.1 Minimum Height From Roof To Lowest Discharge

Opening

 

 

DIRECT VENT GAS, WOOD OR FUEL

OIL TERMINATION

B

C

A

GAS

TERMINATION

 

 

Minimum Dimensions

 

Termination

Wood & Fuel Oil

Comments

 

 

Termination

 

A

6 in.

20 in.

Horizontal distance between terminations

B

20 in.

24 in.

Distance to perpendicular wall

C

18 in.

18 in.

Vertical distance between terminations

 

 

 

 

Figure 6.2 Staggered Termination Caps

DIRECT VENT GAS, WOOD OR FUEL

OIL TERMINATION

 

 

20 IN.

 

 

(508 MM)

 

 

(MINIMUM) TO

 

20 IN. MIN. *

PERPENDICULAR

WOOD OR

WALL

(508 MM)

GAS TERMINATION

(GAS ONLY)

 

*IF USING DECORATIVE CAP COVER(S), THIS DISTANCE MAY NEED TO BE INCREASED. REFER TO THE INSTALLATION INSTRUCTIONS SUPPLIED WITH THE DECORATIVE CAP COVER.

Figure 6.3 Leveled Termination Caps

20

Heat & Glo • SLR • 2143-900 Rev. B • 7/08

Image 20
Contents Model SLR Cosmo What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsListing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesClear Space Decorative Doors and FrontsLighting Instructions IPI Final inspection byAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting FireboxGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections Combustible MantelsNon-combustible Mantels Front Side Finishing DetailAIR Space Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbows Top Vent Horizontal Termination Venting with 3 elbowsTop Vent Horizontal Termination Venting with 3 elbows Top Vent Vertical Termination No Elbows V1 = 44 ft. Max .4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows Top Vent Vertical Termination Venting with 4 elbows V1 MIN H1 MAX V2 MIN H2 MAX V3 MINVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Proper Positioning, Leveling And Securing Of AnInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 15 Secure Pipe with SLP-FSHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components Install Horizontal Termination Cap 22 Venting through the wallGas Pressure Gas InformationFuel Conversion Gas Fitting Access Gas ConnectionWiring Requirements Intellifire Ignition System WiringOptional Accessories Requirements Electrical InformationElectrical Service and Repair Junction Box Installation Junction Box DetailFinishing Framing and Finishing InstructionsFinishing Details Confirm Fireplace Opening Dimension Opening Facing Material 12 Overlap Fit Method Tonic or Martini Decorative Front14 Inside Fit Method Tonic Decorative Front Only Decorative Fronts 17 Tonic Decorative FrontAppliance Setup Remove Fixed Glass AssemblyClean the Appliance AccessoriesCleaning the Rock Rock Media InstructionsScrew Air Shutter Settings Install the MeshAir Shutter Setting Intellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Remove any contaminants that may have accumulated on Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-BEK2SLP-45 45 Elbow SLP90- 90 ElbowExtended Heat Shield RF4-8PVK-80 Support Box-BlackHorizontal Ceiling Firestop AdapterService Parts Part number list on followingAt Depot Service Parts ListStocked IPI Valve Assembly Contact Information