Heat & Glo LifeStyle SLR (COSMO) Install Horizontal Termination Cap, Venting through the wall

Page 42

L. Install Horizontal Termination Cap

WARNING! Risk of Fire! The telescoping flue section of the termination cap MUST be used when connecting vent.

1-1/2 (38 MM) MINIMUM OVERLAP OF FLUE TELE-

SCOPING SECTION IS REQUIRED.

FAILURE TO MAINTAIN OVERLAP MAY CAUSE OVER- HEATING AND FIRE.

Vent termination must not be recessed in the wall. Siding may be brought to the edge of the cap base.

Flash and seal as appropriate for siding material at outside edges of cap.

When installing a horizontal termination cap, follow the cap location guidelines as prescribed by current ANSI Z223.1 and CAN/CGA-B149installation codes and refer to Section 6 of this manual.

CAUTION! Risk of Burns! Local codes may require in- stallation of a cap shield to prevent anything or anyone from touching the hot cap.

NOTICE: For certain exposures which require superior resistance to wind-driven rain penetration, a flashing kit and HRC caps are available. When penetrating a brick wall, a brick extension kit is available for framing the brick.

Note: When using termination caps with factory-supplied heat shield attached, no additional wall shield firestop is required on the exterior side of a combustible wall.

HEAT SHIELD OR

HEAT SHIELD

EXTENDED

1-1/2 IN. (38 MM) MIN.

HEAT SHIELD

OVERLAP

WALL SHIELD

 

FIRESTOP

 

SLIP SECTION

 

CAN BE EXTENDED

 

INNER VENT

SHEATHING

OUTER VENT

 

INTERIOR

EXTERIOR

Figure 10.22 Venting through the wall

 

42

Heat & Glo • SLR • 2143-900 Rev. B • 7/08

Image 42
Contents Model SLR Cosmo What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsListing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Decorative Doors and FrontsLighting Instructions IPI Final inspection byFrequently Asked Questions Initial Break-in ProcedureAfter Fireplace is Lit Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlVenting Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesNon-combustible Mantels Mantel and Wall ProjectionsCombustible Mantels Front Side Finishing DetailAIR Space Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbows Top Vent Horizontal Termination Venting with 3 elbowsTop Vent Horizontal Termination Venting with 3 elbows Top Vent Vertical Termination No Elbows V1 = 44 ft. Max .4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows Top Vent Vertical Termination Venting with 4 elbows V1 MIN H1 MAX V2 MIN H2 MAX V3 MINWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Proper Positioning, Leveling And Securing Of AnInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 15 Secure Pipe with SLP-FSInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 22 Venting through the wallGas Information Fuel ConversionGas Pressure Gas Fitting Access Gas ConnectionOptional Accessories Requirements Wiring RequirementsIntellifire Ignition System Wiring Electrical InformationElectrical Service and Repair Junction Box Installation Junction Box DetailFinishing Framing and Finishing InstructionsFinishing Details Confirm Fireplace Opening Dimension Opening Facing Material 12 Overlap Fit Method Tonic or Martini Decorative Front14 Inside Fit Method Tonic Decorative Front Only Decorative Fronts 17 Tonic Decorative FrontClean the Appliance Appliance SetupRemove Fixed Glass Assembly AccessoriesCleaning the Rock Rock Media InstructionsScrew Install the Mesh Air Shutter SettingAir Shutter Settings Troubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Remove any contaminants that may have accumulated on Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-BEK2Extended Heat Shield SLP-45 45 ElbowSLP90- 90 Elbow RF4-8Horizontal Ceiling Firestop PVK-80Support Box-Black AdapterService Parts Part number list on followingService Parts List StockedAt Depot IPI Valve Assembly Contact Information