Heat & Glo LifeStyle SLR (COSMO) owner manual Securing and Leveling the Appliance

Page 35

B. Securing and Leveling the Appliance

WARNING! Risk of Fire! Prevent contact with:

Sagging or loose insulation

Insulation backing or plastic

Framing and other combustible materials

Block openings into the chase to prevent entry of blown- in insulation. Make sure insulation and other materials are secured.

DO NOT notch the framing around the appliance standoffs. Failure to maintain air space clearance may cause overheating and fire.

For details on setting the appliance in the framing, refer to section 13.A. The diagram shows how to properly position, level, and secure the appliance (see Figure 9.3). Nailing tabs are provided to secure the appliance to the framing members.

Bend out nailing tabs on each side.

Place the appliance into position.

Keep nailing tabs flush with the framing.

Level the appliance from side to side and front to back.

Shim the appliance as necessary. It is acceptable to use wood shims underneath the appliance.

Secure the appliance to the framing by using nails or screws through the nailing tabs.

Secure the appliance to the floor by inserting two screws through the pilot holes at the bottom of the appliance.

Figure 9.3 shows the fireplace installed on the floor. However, this fireplace can be elevated off the floor provided that the fireplace is properly supported by framing materials and the ceiling clearances are maintained.

NAILING TABS

BOTH SIDES

Figure 9.3 Proper Positioning, Leveling And Securing Of An

Appliance

Heat & Glo • SLR • 2143-900 Rev. B • 7/08

35

Image 35
Contents What to do if you smell gas Model SLR CosmoHomeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Heat & GLO GAS Appliance Products Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Decorative Doors and Fronts Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceFinal inspection by Lighting Instructions IPIAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Remote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningFirebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingTypical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseFront Side Finishing Detail Mantel and Wall ProjectionsCombustible Mantels Non-combustible MantelsAIR Space Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Vent Information and Diagrams Minimum Maximum Top Vent Horizontal Termination Venting with 1 elbowTop Vent Horizontal Termination Venting with 2 elbows Venting with 3 elbows Top Vent Horizontal TerminationTop Vent Horizontal Termination Venting with 3 elbows Exhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 = 44 ft. Max .4 mV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsTop Vent Vertical Termination Venting with 3 elbows V1 MIN H1 MAX V2 MIN H2 MAX V3 MIN Top Vent Vertical Termination Venting with 4 elbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationProper Positioning, Leveling And Securing Of An Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof Flashing15 Secure Pipe with SLP-FS Install RF4-8Heat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components 22 Venting through the wall Install Horizontal Termination CapGas Pressure Gas InformationFuel Conversion Gas Connection Gas Fitting AccessElectrical Information Wiring RequirementsIntellifire Ignition System Wiring Optional Accessories RequirementsJunction Box Detail Electrical Service and Repair Junction Box InstallationFraming and Finishing Instructions FinishingFinishing Details Confirm Fireplace Opening Dimension Opening 12 Overlap Fit Method Tonic or Martini Decorative Front Facing Material14 Inside Fit Method Tonic Decorative Front Only 17 Tonic Decorative Front Decorative FrontsAccessories Appliance SetupRemove Fixed Glass Assembly Clean the ApplianceRock Media Instructions Cleaning the RockScrew Air Shutter Settings Install the MeshAir Shutter Setting Intellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Remove any contaminants that may have accumulated on Reference Materials Appliance Dimension DiagramDVP-BEK2 Vent Components DiagramsRF4-8 SLP-45 45 ElbowSLP90- 90 Elbow Extended Heat ShieldAdapter PVK-80Support Box-Black Horizontal Ceiling FirestopPart number list on following Service PartsAt Depot Service Parts ListStocked IPI Valve Assembly Contact Information