Heat & Glo LifeStyle SLR (COSMO) Disassemble Vent Sections, Install Decorative Ceiling Components

Page 38

D. Disassemble Vent Sections

Rotate either section (see Figure 8.7) so the seams on both pipe sections are aligned as shown in Figure 10.8.

Pull carefully to separate the pieces of pipe.

Figure 10.7 Rotate Seams for Disassembly

Figure 10.8 Align and Disassemble Vent Sections

E. Install Decorative Ceiling Components

A decorative ceiling thimble can be installed on a flat ceil- ing through which the vent passes. The decorative ceiling thimble is used to cover the firestop.

Seal the gap between the vent pipe and firestop using high temperature silicone to prevent cold air infiltration.

Install the decorative ceiling thimble by sliding it up to the ceiling and attaching it using the provided screws.

A decorative cathedral ceiling support box can be installed on a cathedral ceiling through which the vent passes.

Use a plumb-bob to mark the center line of the venting system on the ceiling and drill a small hole through the ceiling and roof at this point. Locate the hole and mark the outline of the cathedral ceiling support box on the outside roof.

Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Cut the hole 1/8 in. (3 mm) larger than the support box outline.

Lower the support box through the hole in the roof until its bottom is at least 2 in. (51 mm) below the ceiling (Figure 10.9).

Level the support box both vertically and horizontally and temporarily tack it in place through the inside walls into the roof sheathing.

Use tin snips to cut the support box from the top corners down to the roof line and fold the resulting flaps to the roof. See Figure 10.10.

Nail the flaps to the roof AFTER running a bead of non hardening sealant between the flaps and the roof.

WARNING! Risk of Fire! Clean out ALL materials from inside the support box and complete the vertical vent run and termination.

LEVEL

CATHEDRAL CEILING

SUPPORT BOX

2 in. (51 mm) MIN. BELOW FINISHED CEILING

CUT HOLE 1/8 in. (3 mm)

GREATER IN SIZE THAN

PATTERN OF SUPPORT

BOX AS IT IS PROJECTED

ONTO ROOF LINE

Figure 10.9

Figure 10.10

38

Heat & Glo • SLR • 2143-900 Rev. B • 7/08

Image 38
Contents Model SLR Cosmo What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsListing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Decorative Doors and FrontsLighting Instructions IPI Final inspection byAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlVenting Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesNon-combustible Mantels Mantel and Wall ProjectionsCombustible Mantels Front Side Finishing DetailAIR Space Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbows Top Vent Horizontal Termination Venting with 3 elbowsTop Vent Horizontal Termination Venting with 3 elbows Top Vent Vertical Termination No Elbows V1 = 44 ft. Max .4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows Top Vent Vertical Termination Venting with 4 elbows V1 MIN H1 MAX V2 MIN H2 MAX V3 MINWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Proper Positioning, Leveling And Securing Of AnInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 15 Secure Pipe with SLP-FSHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components Install Horizontal Termination Cap 22 Venting through the wallGas Pressure Gas InformationFuel Conversion Gas Fitting Access Gas ConnectionOptional Accessories Requirements Wiring RequirementsIntellifire Ignition System Wiring Electrical InformationElectrical Service and Repair Junction Box Installation Junction Box DetailFinishing Framing and Finishing InstructionsFinishing Details Confirm Fireplace Opening Dimension Opening Facing Material 12 Overlap Fit Method Tonic or Martini Decorative Front14 Inside Fit Method Tonic Decorative Front Only Decorative Fronts 17 Tonic Decorative FrontClean the Appliance Appliance SetupRemove Fixed Glass Assembly AccessoriesCleaning the Rock Rock Media InstructionsScrew Air Shutter Settings Install the MeshAir Shutter Setting Intellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Remove any contaminants that may have accumulated on Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-BEK2Extended Heat Shield SLP-45 45 ElbowSLP90- 90 Elbow RF4-8Horizontal Ceiling Firestop PVK-80Support Box-Black AdapterService Parts Part number list on followingAt Depot Service Parts ListStocked IPI Valve Assembly Contact Information