Heat & Glo LifeStyle SLR (COSMO) SLP-45 45 Elbow, SLP90- 90 Elbow, Extended Heat Shield, RF4-8

Page 62

B. Vent Components Diagrams (continued)

 

 

6-1/2 in.

6-1/2 in.

 

165 mm

 

 

165 mm

 

6-1/2 in.

 

 

8-3/4 in.

 

165 mm

 

9-1/4 in.

222 mm

6 in.

235 mm

 

152 mm

 

6-5/8 in.

 

 

168 mm

 

6-5/8 in.

SLP-45 - 45° Elbow

 

 

168 mm

 

 

 

 

9-7/8 in.

 

 

251 mm

 

 

SLP90- 90° Elbow

Effective Height/Length

 

 

Pipe

inches

mm

Effective

 

SLP4

4

102

Height/

 

SLP6

6

152

Length

 

SLP12

12

305

 

 

SLP24

24

610

 

 

SLP36

36

914

 

 

SLP48

48

1219

 

SLP-PIPE

SLP6A

2 - 6

51 - 152

 

SLP12A

2 - 12

51 - 305

 

 

26 in.

660 mm

DVP-HSM-B

Extended Heat Shield

SLP-HVS

RF4-8

SLP-FS

SLP-WS

Horizontal Pipe

Roof Flashing

Ceiling Firestop

Wall Shield Firestop

Support

 

 

 

Figure 16.5 SLP Series Vent Components

62

Heat & Glo • SLR • 2143-900 Rev. B • 7/08

Image 62
Contents Model SLR Cosmo What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsListing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Decorative Doors and FrontsLighting Instructions IPI Final inspection byAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlVenting Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesNon-combustible Mantels Mantel and Wall ProjectionsCombustible Mantels Front Side Finishing DetailAIR Space Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbows Top Vent Horizontal Termination Venting with 3 elbowsTop Vent Horizontal Termination Venting with 3 elbows Top Vent Vertical Termination No Elbows V1 = 44 ft. Max .4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows Top Vent Vertical Termination Venting with 4 elbows V1 MIN H1 MAX V2 MIN H2 MAX V3 MINWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Proper Positioning, Leveling And Securing Of AnInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 15 Secure Pipe with SLP-FSHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components Install Horizontal Termination Cap 22 Venting through the wallGas Pressure Gas InformationFuel Conversion Gas Fitting Access Gas ConnectionOptional Accessories Requirements Wiring RequirementsIntellifire Ignition System Wiring Electrical InformationElectrical Service and Repair Junction Box Installation Junction Box DetailFinishing Framing and Finishing InstructionsFinishing Details Confirm Fireplace Opening Dimension Opening Facing Material 12 Overlap Fit Method Tonic or Martini Decorative Front14 Inside Fit Method Tonic Decorative Front Only Decorative Fronts 17 Tonic Decorative FrontClean the Appliance Appliance SetupRemove Fixed Glass Assembly AccessoriesCleaning the Rock Rock Media InstructionsScrew Air Shutter Settings Install the MeshAir Shutter Setting Intellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Remove any contaminants that may have accumulated on Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-BEK2Extended Heat Shield SLP-45 45 ElbowSLP90- 90 Elbow RF4-8Horizontal Ceiling Firestop PVK-80Support Box-Black AdapterService Parts Part number list on followingAt Depot Service Parts ListStocked IPI Valve Assembly Contact Information