B. Assemble Slip Sections

Slide the inner flue of the slip section into the inner flue of the pipe section and the outer flue of the slip section over the outer flue of the pipe section. See Figure 10.3.

Slide together to the desired length.

Pilot hole

Figure 10.3 Slip Section Pilot Holes

Maintain a 1-1/2 in. (38 mm) overlap between the slip section and the pipe section.

Secure the pipe and slip section with two screws no longer than 1/2 in. (13 mm), using the pilot holes in the slip section. See Figure 10.4.

Figure 10.4 Screws into Slip Section

Continue adding pipe as necessary following instructions in “Assembling Pipe Sections.”

NOTICE: If slip section is too long, the inner and outer flues of the slip section can be cut to the desired length.

NOTICE: When installing a vent system with an HRC termination cap, all pipe system joints shall be sealed using a high temperature silicone sealant.

Apply a bead of silicone sealant inside the female outer pipe joint prior to joining sections.

Only outer pipes are sealed, sealing the inner flue is not required.

All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed.

C.Secure The Vent Sections

Vertical runs of pipe must be supported every 8 ft. (2.44 m).

Horizontal sections must be supported every 5 feet (1.52 m).

Vent supports or plumbers strap (spaced 120º apart) may be used to support. See figures 10.5 and 10.6.

Wall shield firestops may be used to provide horizontal support.

Ceiling firestops have tabs that may be used to provide vertical support.

WARNING! Risk of Fire, Explosion or Asphyxiation! Improper support may allow vent to sag and separate. Use vent run supports and connect vent sections per in- stallation instructions. DO NOT allow vent to sag below connection point to appliance.

Figure 10.5

Securing Vertical Pipe Sections

Î

Figure 10.6 Securing Horizontal Pipe Sections

Î

Heat & Glo • SLR • 2143-900 Rev. B • 7/08

37

Image 37
Contents What to do if you smell gas Model SLR CosmoHomeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsLimited Lifetime Warranty Heat & GLO GAS Appliance Products Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyClear Space Decorative Doors and FrontsFinal inspection by Lighting Instructions IPIInitial Break-in Procedure Frequently Asked QuestionsAfter Fireplace is Lit Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting FireboxTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseCombustible Mantels Mantel and Wall ProjectionsNon-combustible Mantels Front Side Finishing DetailAIR Space Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Vent Information and Diagrams Minimum Maximum Top Vent Horizontal Termination Venting with 1 elbowTop Vent Horizontal Termination Venting with 2 elbows Venting with 3 elbows Top Vent Horizontal TerminationTop Vent Horizontal Termination Venting with 3 elbows Exhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 = 44 ft. Max .4 mV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsTop Vent Vertical Termination Venting with 3 elbows V1 MIN H1 MAX V2 MIN H2 MAX V3 MIN Top Vent Vertical Termination Venting with 4 elbowsPipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationProper Positioning, Leveling And Securing Of An Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof Flashing15 Secure Pipe with SLP-FS Install RF4-8Install Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination 22 Venting through the wall Install Horizontal Termination CapFuel Conversion Gas InformationGas Pressure Gas Connection Gas Fitting AccessIntellifire Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Electrical InformationJunction Box Detail Electrical Service and Repair Junction Box InstallationFraming and Finishing Instructions FinishingFinishing Details Confirm Fireplace Opening Dimension Opening 12 Overlap Fit Method Tonic or Martini Decorative Front Facing Material14 Inside Fit Method Tonic Decorative Front Only 17 Tonic Decorative Front Decorative FrontsRemove Fixed Glass Assembly Appliance SetupClean the Appliance AccessoriesRock Media Instructions Cleaning the RockScrew Air Shutter Setting Install the MeshAir Shutter Settings Symptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Remove any contaminants that may have accumulated on Reference Materials Appliance Dimension DiagramDVP-BEK2 Vent Components DiagramsSLP90- 90 Elbow SLP-45 45 ElbowExtended Heat Shield RF4-8Support Box-Black PVK-80Horizontal Ceiling Firestop AdapterPart number list on following Service PartsStocked Service Parts ListAt Depot IPI Valve Assembly Contact Information