Heat & Glo LifeStyle SLR (COSMO) owner manual Top Vent Horizontal Termination Venting with 1 elbow

Page 23

WARNING

Fire Risk. Explosion Risk.

Do NOT pack insulation or other combustibles between ceiling firestops.

ALWAYS maintain specified clearances around venting and firestop systems.

Install wall shield and ceiling firestops as specified.

Failure to keep insulation or other material away from vent pipe may cause fire.

Top Vent - Horizontal Termination

Venting with 1 elbow

V Minimum

H1 Maximum

SLR

 

 

 

 

 

 

90 Elbow

1-1/2 ft.

610 mm

 

 

 

 

1 ft.

305 mm

3 ft.

914 mm

 

 

 

 

2 ft.

610 mm

5 ft.

1.5 m

 

 

 

 

3 ft.

914 mm

7 ft.

2.1 m

 

 

 

 

4 ft.

1.2 m

14 ft.

4.3 m

 

 

 

 

H MAX. =14 ft. (4.3 m)

V + H MAX. = 40 ft. (12.2 m)

H1

Note: Use SLP Series components only.

Note: There MUST be a 25% reduction in total H when using flex vent except when using the simple up and out installation (see Figure 7.3).

Note: The SLP-HRC-SS and SLP-HRC-ZC-SS termination caps are not approved for use with propane (LP) fuel.

V1

Figure 7.4

Heat & Glo • SLR • 2143-900 Rev. B • 7/08

23

Image 23
Contents What to do if you smell gas Model SLR CosmoHomeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Heat & GLO GAS Appliance Products Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Decorative Doors and Fronts Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceFinal inspection by Lighting Instructions IPIAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Remote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningFirebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingTypical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseFront Side Finishing Detail Mantel and Wall ProjectionsCombustible Mantels Non-combustible MantelsAIR Space Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Vent Information and Diagrams Minimum Maximum Top Vent Horizontal Termination Venting with 1 elbowTop Vent Horizontal Termination Venting with 2 elbows Venting with 3 elbows Top Vent Horizontal TerminationTop Vent Horizontal Termination Venting with 3 elbows Exhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 = 44 ft. Max .4 mV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsTop Vent Vertical Termination Venting with 3 elbows V1 MIN H1 MAX V2 MIN H2 MAX V3 MIN Top Vent Vertical Termination Venting with 4 elbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationProper Positioning, Leveling And Securing Of An Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof Flashing15 Secure Pipe with SLP-FS Install RF4-8Heat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components 22 Venting through the wall Install Horizontal Termination CapGas Pressure Gas InformationFuel Conversion Gas Connection Gas Fitting AccessElectrical Information Wiring RequirementsIntellifire Ignition System Wiring Optional Accessories RequirementsJunction Box Detail Electrical Service and Repair Junction Box InstallationFraming and Finishing Instructions FinishingFinishing Details Confirm Fireplace Opening Dimension Opening 12 Overlap Fit Method Tonic or Martini Decorative Front Facing Material14 Inside Fit Method Tonic Decorative Front Only 17 Tonic Decorative Front Decorative FrontsAccessories Appliance SetupRemove Fixed Glass Assembly Clean the ApplianceRock Media Instructions Cleaning the RockScrew Air Shutter Settings Install the MeshAir Shutter Setting Intellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Remove any contaminants that may have accumulated on Reference Materials Appliance Dimension DiagramDVP-BEK2 Vent Components DiagramsRF4-8 SLP-45 45 ElbowSLP90- 90 Elbow Extended Heat ShieldAdapter PVK-80Support Box-Black Horizontal Ceiling FirestopPart number list on following Service PartsAt Depot Service Parts ListStocked IPI Valve Assembly Contact Information