Heat & Glo LifeStyle SLR (COSMO) owner manual Framing and Finishing Instructions

Page 47

13 Finishing

A. Framing and Finishing Instructions

WARNING! Risk of Fire! Comply with all minimum clear- ances to combustibles as specified. Framing closer than the minimums listed must be constructed entirely of noncom- bustible materials (i.e., steel studs, concrete board, etc.) Failure to comply could cause fire.

Finishing Instructions

It is important to follow the framing and finishing instructions to ensure proper placement of fireplace into the surrounding framing/finishing materials.

Wall sheathing materials 1/2 in. thick are specified in this installation manual to properly align with the factory- installed non combustible material

Setting the Fireplace into the Framing

Unlike many traditional, single-sided Heat & Glo fireplaces, this fireplace is recessed into surround framing. The left and right nailing tabs were designed for the SLR model as a means to ensure the fireplace is recessed to the correct location within the framing materials.

1.Bend three nailing tabs away from fireplace 180 degrees on both left and right nailing tabs. Do not adjust the column standoffs. See Figure 13.1 and Figure 13.2.

2.Screw each nailing tab to the adjoining framing material. Ensure that the 1” air space clearance is maintained on the sides of the fireplace. See Figure 13.3.

WARNING! Risk of Fire! DO NOT, under any circumstances, remove the factory-installed non- combustible board or cover it with any combustible material, such as:

Top Flange

Factory-Installed

Non-Combustible

Board

NAILING TABS

Top Flange

Factory-Installed

Non-Combustible

Board

Drywall (gypsum board)

Plywood

Or other materials that do not meet the ASTM E 136 Non-combustibility standard. See specification below

Failure to comply with these instructions may cause a fire or cause the appliance to overheat.

Non-Combustible Materials Specification

Material which will not ignite and burn. Such materials are those consisting entirely of steel, iron, brick, tile, concrete, slate, glass or plasters, or any combination thereof.

Materials that are reported as passing ASTM E 136,

Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 ºC and UL763 shall be considered non-combustible materials.

DO NOT ADJUST

Figure 13.1 Nailing Tabs

Figure 13.2 Nailing Tabs

Shipping Position

Installation Position

1.00 in.

FRAMING

1-9/16 in.

1/2 in. BUILDING MATERIAL

Figure 13.3 Front Side Finishing Detail

Heat & Glo • SLR • 2143-900 Rev. B • 7/08

47

Image 47
Contents What to do if you smell gas Model SLR CosmoHomeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Heat & GLO GAS Appliance Products Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Decorative Doors and Fronts Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceFinal inspection by Lighting Instructions IPIAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Remote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningFirebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingTypical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseFront Side Finishing Detail Mantel and Wall ProjectionsCombustible Mantels Non-combustible MantelsAIR Space Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Vent Information and Diagrams Minimum Maximum Top Vent Horizontal Termination Venting with 1 elbowTop Vent Horizontal Termination Venting with 2 elbows Venting with 3 elbows Top Vent Horizontal TerminationTop Vent Horizontal Termination Venting with 3 elbows Exhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 = 44 ft. Max .4 mV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsTop Vent Vertical Termination Venting with 3 elbows V1 MIN H1 MAX V2 MIN H2 MAX V3 MIN Top Vent Vertical Termination Venting with 4 elbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationProper Positioning, Leveling And Securing Of An Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof Flashing15 Secure Pipe with SLP-FS Install RF4-8Heat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components 22 Venting through the wall Install Horizontal Termination CapGas Pressure Gas InformationFuel Conversion Gas Connection Gas Fitting AccessElectrical Information Wiring RequirementsIntellifire Ignition System Wiring Optional Accessories RequirementsJunction Box Detail Electrical Service and Repair Junction Box InstallationFraming and Finishing Instructions FinishingFinishing Details Confirm Fireplace Opening Dimension Opening 12 Overlap Fit Method Tonic or Martini Decorative Front Facing Material14 Inside Fit Method Tonic Decorative Front Only 17 Tonic Decorative Front Decorative FrontsAccessories Appliance SetupRemove Fixed Glass Assembly Clean the ApplianceRock Media Instructions Cleaning the RockScrew Air Shutter Settings Install the MeshAir Shutter Setting Intellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Remove any contaminants that may have accumulated on Reference Materials Appliance Dimension DiagramDVP-BEK2 Vent Components DiagramsRF4-8 SLP-45 45 ElbowSLP90- 90 Elbow Extended Heat ShieldAdapter PVK-80Support Box-Black Horizontal Ceiling FirestopPart number list on following Service PartsAt Depot Service Parts ListStocked IPI Valve Assembly Contact Information