1. Top Vent - Horizontal Termination - (continued)
|
|
|
|
|
| Top Vent - Horizontal Termination | |||
|
|
|
|
|
|
| Venting with 3 elbows | ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| SLR |
|
|
|
V1 Minimum | H1 + H2 Maximum | V2 | V1 + V2 Minimum |
| |||||
90° Elbow | 6 ft. |
|
|
| 1.8 m | * | * |
| |
1 ft. | 305 mm | 10 ft. |
|
|
| 3.0 m | * | * |
|
2 ft. | 610 mm | 12 ft. |
|
|
| 3.7 m | * | * |
|
3 ft. | 914 mm | 14 ft. |
|
|
| 4.3 m | * | * |
|
|
| H1 | + H2 | MAX. =14 ft. (4.3 m) |
|
| |||
|
| V1 + V2 + H1 | + H2 MAX. = 40 ft. (12.2 m) |
|
| ||||
*No specific restrictions on this value EXCEPT V1 + V2 + H cannot exceed 40 ft. (12.2 m) |
|
Note: Use SLP Series components only.
Note: There MUST be a 25% reduction in total H when using flex vent except when using the simple up and out installation (see Figure 7.3).
Note: The
H2
V2
H1V1
Figure 7.6
Heat & Glo • SLR • | 25 |