Heat & Glo LifeStyle 2137-900 Vent Information and Diagrams, Vent Table Key, Use of Elbows

Page 11

5 Vent Information and Diagrams

A. Vent Table Key

The abbreviations listed in this vent table key are used in the vent diagrams.

Symbol

Description

 

 

V1

First section (closest to appliance) of vertical length

 

 

V2

Second section of vertical length

 

 

H1

First section (closest to appliance) of horizontal length

 

 

H2

Second section of horizontal length

 

 

WARNING

Fire Hazard. Explosion Risk. Asphyxiation Risk.

Do NOT connect this gas appliance to a chimney flue serving a separate solid-fuel or gas burning appliance.

• Vent this appliance directly outside.

• Use separate vent system for this appliance.

May impair safe operation of this appliance or other appliances connected to the flue.

B. Use of Elbows

CAUTION

ALL vent configuration specifications MUST be followed.

This product is tested and listed to these specifications.

Appliance performance will suffer if specifications are not followed.

Diagonal runs have both vertical and horizontal vent as- pects when calculating the effects. Use the rise for the vertical aspect and the run for the horizontal aspect (see Figure 5.1).

Two 45º elbows may be used in place of one 90º elbow. On 45º runs, one foot of diagonal is equal to 8-1/2 (216 mm) inches horizontal run and 8-1/2 (216 mm) inches vertical run. A length of straight pipe is allowed between two 45º elbows (see Figure 5.1).

Verticalin.

1/2-8

8-1/2 in.

Horizontal

Figure 5.1

C. Measuring Standards

Vertical and horizontal measurements listed in the vent diagrams were made using the following standards.

1.Pipe measurements are shown using the effective length of pipe (see Figure 5.2).

2.Horizontal terminations are measured to the outside mounting surface (flange of termination cap) (see Figure 4.1).

3.Vertical terminations are measured to bottom of termi- nation cap.

4.Horizontal pipe installed level with no rise.

 

Effective Height/Length

 

Pipe

inches

mm

 

SLP4

4

102

 

SLP6

6

152

Effective

SLP12

12

305

Height/

SLP24

24

610

Length

SLP36

36

914

 

 

SLP48

48

1219

 

SLP6A

2 - 6

51 - 152

 

SLP12A

2 - 12

51 - 305

Figure 5.2 SLP Pipe Effective Length

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

11

Image 11
Contents Hot glass will cause burns Model Soho24BWhat to do if you smell gas Homeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsTools and Supplies Needed Installation to ensure maximum safety and benefitGetting Started Mantel Projections Framing and ClearancesSelecting Appliance Location Clearances Constructing the Appliance ChaseSee .4 for specific clearances Termination LocationsVent Termination Minimum Clearances Inches U.S.A Covered Alcove ApplicationsMeasuring Standards Vent Information and DiagramsVent Table Key Use of ElbowsMinimum Maximum Vent DiagramsTop Vent Horizontal Termination One Elbow Two ElbowsV1 Min H1 Max V2 Min H2 Max Top Vent Horizontal Termination Three ElbowsV1 Minimum H1 Maximum V1 + Top Vent Vertical Termination No ElbowV1 = 45 ft Max .72 m V1 = 3 ft Min mm V1 Minimum H1+ H2 Maximum V1+ V2 Minimum Top Vent Vertical Termination Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Vertical Penetration FramingVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationMaterial Installation of Non-combustible Facing MaterialProper Positioning, Leveling and Securing of a Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent PipeSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components 17 Venting through the wall Install Horizontal Termination CapPressure Natural Gas Propane Gas InformationFuel Conversions Gas Connection Gas PressuresHigh Altitude Installations Electrical Information Recommendation for WireGRN wire Ground attached To GRN screw with Inside box Junction Box InstallationSee for combustible/non-combustible definitions FinishingFacing Material Painting Installation of Non-Combustible Facing MaterialsRemove Shipping Materials Appliance SetupClean the Appliance AccessoriesPositioning Stones Stone Placement Soho24BNo Stones in this Area Replacing Glass Assembly Glass AssemblyAir Shutter Setting Removing Glass AssemblyBefore Lighting Appliance Operating InstructionsFinal inspection by Lighting Instructions IPIAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Sympton Possible Cause Corrective Action TroubleshootingIntelliFire Ignition System Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksRecommend addition of screen if one is not present Inspect Maintenance TasksLocation Inches Millimeter Appliance Dimension DiagramAppliance Dimensions Table Reference MaterialsSL Series Components Vent Components Diagrams B. Vent Components Diagrams Assembly 318 mm 356 mm 330 mm305 mm 12-1/224 x 24 Direct Vent Fireplace Service PartsStocked At Depot#11 IPI Valve Assembly No longer available SOHO24B-ONYXLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Contact Information