Heat & Glo LifeStyle 2137-900 owner manual No Stones in this Area

Page 36

Figure 12.6.

Step 5. Carefully place a layer of stones over the pilot shield to disguise it.

Figure 12.7.

Step 6. Spread the stones out evenly. Double check that there is only one layer of stones on the burner area and that the cross-hatched area in Figure 1 is still free of stones.

Figure 12.8.

Step 7. Carefully remove the stone placement jig making sure that no stones fall into the pilot area.

NO STONES IN THIS AREA

Figure 12.9.

Step 8. This is a view of the front area of the pilot shield. This area must be free of stones for safe operation.

36

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

Image 36
Contents Model Soho24B What to do if you smell gasHot glass will cause burns Congratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsInstallation to ensure maximum safety and benefit Getting StartedTools and Supplies Needed Framing and Clearances Selecting Appliance LocationMantel Projections Constructing the Appliance Chase ClearancesTermination Locations Vent Termination Minimum ClearancesSee .4 for specific clearances Covered Alcove Applications Inches U.S.AVent Information and Diagrams Vent Table KeyUse of Elbows Measuring StandardsVent Diagrams Top Vent Horizontal Termination One ElbowTwo Elbows Minimum MaximumTop Vent Horizontal Termination Three Elbows V1 Min H1 Max V2 Min H2 MaxTop Vent Vertical Termination No Elbow V1 = 45 ft Max .72 m V1 = 3 ft Min mmV1 Minimum H1 Maximum V1 + Top Vent Vertical Termination Three Elbows V1 Minimum H1+ H2 Maximum V1+ V2 MinimumVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationVertical Penetration Framing Pipe SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentInstallation of Non-combustible Facing Material MaterialSecuring and Leveling the Appliance Proper Positioning, Leveling and Securing of aInstalling Vent Pipe Assemble Vent SectionsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the wallGas Information Fuel Conversions Gas ConnectionGas Pressures Pressure Natural Gas PropaneHigh Altitude Installations Recommendation for Wire Electrical InformationJunction Box Installation GRN wire Ground attached To GRN screw with Inside boxFinishing Facing MaterialSee for combustible/non-combustible definitions Installation of Non-Combustible Facing Materials PaintingAppliance Setup Clean the ApplianceAccessories Remove Shipping MaterialsStone Placement Soho24B Positioning StonesNo Stones in this Area Glass Assembly Air Shutter SettingRemoving Glass Assembly Replacing Glass AssemblyOperating Instructions Before Lighting ApplianceLighting Instructions IPI Final inspection byFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting IntelliFire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Recommend addition of screen if one is not presentAppliance Dimension Diagram Appliance Dimensions TableReference Materials Location Inches MillimeterVent Components Diagrams SL Series Components B. Vent Components Diagrams Assembly 356 mm 330 mm 305 mm12-1/2 318 mmService Parts StockedAt Depot 24 x 24 Direct Vent Fireplace#11 IPI Valve Assembly SOHO24B-ONYX No longer availableLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Contact Information