Heat & Glo LifeStyle 2137-900 356 mm 330 mm, 305 mm, 12-1/2, 318 mm, 192 mm, Termination Cap

Page 49

B. Vent Components Diagrams (continued)

 

14 in.

 

 

 

13 in.

 

 

356 mm

 

 

 

330 mm

 

10-9/16 in.

 

 

 

13 in.

 

1-5/16 in.

 

 

 

 

34 mm

269 mm

 

 

 

330 mm

 

SLP-CCS-BK

 

 

 

SLP-DCF-BK

 

 

 

Ceiling Firestop

 

Cathedral Ceiling

 

 

 

 

 

 

Black

 

Support Box-Black

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12 in.

 

 

 

 

 

 

305 mm

 

14-1/16 in.

 

 

 

 

12-1/2 in.

357 mm

 

 

 

 

 

 

 

 

318 mm

 

 

 

 

 

 

 

 

 

10-3/4 in.

 

 

 

 

14 in.

7-1/2 in.

273 mm

 

 

 

 

 

 

 

 

 

356 mm

192 mm

 

 

 

 

 

 

SLP-FLEX-TRAP

 

SLP-TVHW

 

 

Horizontal

 

 

Vertical

 

 

Termination Kit

 

Termination Cap

 

 

10-11/16 in.

 

 

7-1/4 in.

 

 

271mm

 

 

 

 

1 in.

(184 mm)

 

 

 

 

 

 

 

 

(25 mm)

 

 

28-1/2 in.

 

 

 

 

 

 

724 mm

 

 

 

14 in.

 

 

 

 

 

(356 mm)

 

 

 

 

 

 

3/8 in. (10 mm)

 

13-1/2 in.

 

 

 

1 in. (25 mm)

 

 

 

 

 

 

 

343 mm

 

 

 

 

7-3/4 to 10-3/8 in.

 

 

 

 

 

(197 to 264 mm)

SLK-SNKD

 

 

 

DVP-FBHT

 

Snorkel

 

 

 

Horizontal

 

Termination Cap

 

 

 

Termination Cap

Figure 16.3 SLP Series Vent Components

 

 

 

 

 

 

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

 

 

49

Image 49
Contents What to do if you smell gas Model Soho24BHot glass will cause burns Homeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGetting Started Installation to ensure maximum safety and benefitTools and Supplies Needed Selecting Appliance Location Framing and ClearancesMantel Projections Clearances Constructing the Appliance ChaseVent Termination Minimum Clearances Termination LocationsSee .4 for specific clearances Inches U.S.A Covered Alcove ApplicationsVent Table Key Vent Information and DiagramsUse of Elbows Measuring StandardsTop Vent Horizontal Termination One Elbow Vent DiagramsTwo Elbows Minimum MaximumV1 Min H1 Max V2 Min H2 Max Top Vent Horizontal Termination Three ElbowsV1 = 45 ft Max .72 m V1 = 3 ft Min mm Top Vent Vertical Termination No ElbowV1 Minimum H1 Maximum V1 + V1 Minimum H1+ H2 Maximum V1+ V2 Minimum Top Vent Vertical Termination Three ElbowsPipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Vertical Penetration FramingFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationMaterial Installation of Non-combustible Facing MaterialProper Positioning, Leveling and Securing of a Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent PipeSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingInstall Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination 17 Venting through the wall Install Horizontal Termination CapFuel Conversions Gas Connection Gas InformationGas Pressures Pressure Natural Gas PropaneHigh Altitude Installations Electrical Information Recommendation for WireGRN wire Ground attached To GRN screw with Inside box Junction Box InstallationFacing Material FinishingSee for combustible/non-combustible definitions Painting Installation of Non-Combustible Facing MaterialsClean the Appliance Appliance SetupAccessories Remove Shipping MaterialsPositioning Stones Stone Placement Soho24BNo Stones in this Area Air Shutter Setting Glass AssemblyRemoving Glass Assembly Replacing Glass AssemblyBefore Lighting Appliance Operating InstructionsFinal inspection by Lighting Instructions IPIInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit IntelliFire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksRecommend addition of screen if one is not present Inspect Maintenance TasksAppliance Dimensions Table Appliance Dimension DiagramReference Materials Location Inches MillimeterSL Series Components Vent Components Diagrams B. Vent Components Diagrams Assembly 305 mm 356 mm 330 mm12-1/2 318 mmStocked Service PartsAt Depot 24 x 24 Direct Vent Fireplace#11 IPI Valve Assembly No longer available SOHO24B-ONYXLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Contact Information