Heat & Glo LifeStyle 2137-900 owner manual Junction Box Installation

Page 31

PLUG-IN

3V TRANSFORMER

ON/OFF

WALL SWITCH

IGNITION

 

MODULE

 

(3V)

 

VALVE

LOW VOLTAGE

 

SEE NOTE 1

NEUTRAL

GROUND REMOTE

 

CONTROL HOT

BLACK WIRE CAN BE

 

PLUGGED INTO ANY

 

OF #1 - #5 LOCATIONS

 

ON THE HOT SIDE

 

WHITE WIRE CAN BE

PLUGGED INTO ANY

OF#1 - #5 LOCATIONS

ON THE NEUTRAL SIDE

TRANSFORMER

3 VAC

IGNITION MODULE 3 VAC

ORG

WHT

 

GROUND TO

 

FIREPLACE

 

CHASSIS*

BLK

ORG

 

RED

BRN

BRN

VALVE

INTERMITTENT

PILOT IGNITOR

GRN

THERMOSTAT

WIRE

ASSEMBLY

PLUG-IN

REMOTE JUMPER WIRE

Figure 10.1 IntelliFire Pilot Ignition (IPI) Wiring Diagram - Standard Method. Note: Appliance will not operate unless properly grounded.

D. Junction Box Installation

If the box is being wired from the OUTSIDE of the appliance:

Remove the cover plate located on the outer shell - right side (see Figure 10.2).

Install the supplied Romex™ connector in the cover plate.

Feed the necessary length of wire through the connector.

Make all necessary wire connections and reattach the cover plate to the outer shell.

If the box is being wired from the INSIDE of the appliance:

Remove the screw attaching the junction box/ receptacle to the outer shell, rotate the junction box inward to disengage it from the outer shell (see Figure 10.2).

Pull the electrical wires from outside the appliance through this opening into the valve compartment.

 

Romex

 

Connector

 

14/2WG

 

Cover Plate

 

outside firebox

WHT

 

BLK

 

WHT

 

BLK

Copper

 

GRN wire

ground attached

to GRN screw with

inside box

GRN wire

 

NOTE: Do NOT wire

 

110VAC to wall switch.

Figure 10.2 Junction Box Detail

Feed the necessary length of wire through the connector.

Make all necessary wire connections to the junction box/ receptacle and reassemble the junction box/receptacle to the

outer shell.

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

31

Image 31
Contents What to do if you smell gas Model Soho24BHot glass will cause burns Homeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGetting Started Installation to ensure maximum safety and benefitTools and Supplies Needed Selecting Appliance Location Framing and ClearancesMantel Projections Clearances Constructing the Appliance ChaseVent Termination Minimum Clearances Termination LocationsSee .4 for specific clearances Inches U.S.A Covered Alcove ApplicationsMeasuring Standards Vent Information and DiagramsVent Table Key Use of ElbowsMinimum Maximum Vent DiagramsTop Vent Horizontal Termination One Elbow Two ElbowsV1 Min H1 Max V2 Min H2 Max Top Vent Horizontal Termination Three ElbowsV1 = 45 ft Max .72 m V1 = 3 ft Min mm Top Vent Vertical Termination No ElbowV1 Minimum H1 Maximum V1 + V1 Minimum H1+ H2 Maximum V1+ V2 Minimum Top Vent Vertical Termination Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Vertical Penetration FramingFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationMaterial Installation of Non-combustible Facing MaterialProper Positioning, Leveling and Securing of a Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent PipeSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingInstall Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination 17 Venting through the wall Install Horizontal Termination CapPressure Natural Gas Propane Gas InformationFuel Conversions Gas Connection Gas PressuresHigh Altitude Installations Electrical Information Recommendation for WireGRN wire Ground attached To GRN screw with Inside box Junction Box InstallationFacing Material FinishingSee for combustible/non-combustible definitions Painting Installation of Non-Combustible Facing MaterialsRemove Shipping Materials Appliance SetupClean the Appliance AccessoriesPositioning Stones Stone Placement Soho24BNo Stones in this Area Replacing Glass Assembly Glass AssemblyAir Shutter Setting Removing Glass AssemblyBefore Lighting Appliance Operating InstructionsFinal inspection by Lighting Instructions IPIInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit IntelliFire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksRecommend addition of screen if one is not present Inspect Maintenance TasksLocation Inches Millimeter Appliance Dimension DiagramAppliance Dimensions Table Reference MaterialsSL Series Components Vent Components Diagrams B. Vent Components Diagrams Assembly 318 mm 356 mm 330 mm305 mm 12-1/224 x 24 Direct Vent Fireplace Service PartsStocked At Depot#11 IPI Valve Assembly No longer available SOHO24B-ONYXLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Contact Information