Heat & Glo LifeStyle 2137-900 Termination Locations, Vent Termination Minimum Clearances

Page 9

4 Termination Locations

A. Vent Termination Minimum Clearances

HORIZONTAL OVERHANG

WARNING

Fire Risk. Explosion Risk.

Maintain vent clearance to combustibles as specified.

Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fire.

2FT.

MIN.

GAS DIRECT VENT

TERMINATION CAP

20 INCHES MIN.

VERTICAL

LOWEST

WALL

 

DISCHARGE

 

OPENING

 

X

12

ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING

Measure vertical clearances from this surface.

Measure horizontal clearances from this surface.

(See Figure 4.4 for specific clearances)

Figure 4.1

Roof Pitch

H (Min.) Ft.

Flat to 6/12

1.0*

Over 6/12 to 7/12

1.25*

Over 7/12 to 8/12

1.5*

Over 8/12 to 9/12

2.0*

Over 9/12 to 10/12

2.5

Over 10/12 to 11/12

3.25

Over 11/12 to 12/12

4.0

Over 12/12 to 14/12

5.0

Over 14/12 to 16/12

6.0

Over 16/12 to 18/12

7.0

Over 18/12 to 20/12

7.5

Over 20/12 to 21/12

8.0

* 3 foot minimum in snow regions

Figure 4.2 Minimum height from roof to lowest discharge opening

Figure 4.2 specifies minimum vent heights for various pitched roofs.

A

B

6 in. (minimum) up to 20 in.

18 in. minimum

152 mm/508 mm

457 mm

20 in. and over

0 in. minimum

Gas, Wood or Fuel Oil

Termination Cap

B

A *

Gas

Termination

Cap **

*If using decorative cap cover(s), this distance may need to be increased. Refer to the installation instructions supplied with the decorative cap cover.

**In a staggered installation with both gas and wood or fuel oil terminations, the wood or fuel oil termination cap must be higher than the gas termination cap.

Figure 4.3 Multiple Vertical Termination

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

9

Image 9
Contents Model Soho24B What to do if you smell gasHot glass will cause burns Homeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsInstallation to ensure maximum safety and benefit Getting StartedTools and Supplies Needed Framing and Clearances Selecting Appliance LocationMantel Projections Clearances Constructing the Appliance ChaseTermination Locations Vent Termination Minimum ClearancesSee .4 for specific clearances Inches U.S.A Covered Alcove ApplicationsVent Table Key Vent Information and DiagramsUse of Elbows Measuring StandardsTop Vent Horizontal Termination One Elbow Vent DiagramsTwo Elbows Minimum MaximumV1 Min H1 Max V2 Min H2 Max Top Vent Horizontal Termination Three ElbowsTop Vent Vertical Termination No Elbow V1 = 45 ft Max .72 m V1 = 3 ft Min mmV1 Minimum H1 Maximum V1 + V1 Minimum H1+ H2 Maximum V1+ V2 Minimum Top Vent Vertical Termination Three ElbowsPipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Vertical Penetration FramingInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationMaterial Installation of Non-combustible Facing MaterialProper Positioning, Leveling and Securing of a Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent PipeSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination 17 Venting through the wall Install Horizontal Termination CapFuel Conversions Gas Connection Gas InformationGas Pressures Pressure Natural Gas PropaneHigh Altitude Installations Electrical Information Recommendation for WireGRN wire Ground attached To GRN screw with Inside box Junction Box InstallationFinishing Facing MaterialSee for combustible/non-combustible definitions Painting Installation of Non-Combustible Facing MaterialsClean the Appliance Appliance SetupAccessories Remove Shipping MaterialsPositioning Stones Stone Placement Soho24BNo Stones in this Area Air Shutter Setting Glass AssemblyRemoving Glass Assembly Replacing Glass AssemblyBefore Lighting Appliance Operating InstructionsFinal inspection by Lighting Instructions IPIFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting IntelliFire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksRecommend addition of screen if one is not present Inspect Maintenance TasksAppliance Dimensions Table Appliance Dimension DiagramReference Materials Location Inches MillimeterSL Series Components Vent Components Diagrams B. Vent Components Diagrams Assembly 305 mm 356 mm 330 mm12-1/2 318 mmStocked Service PartsAt Depot 24 x 24 Direct Vent Fireplace#11 IPI Valve Assembly No longer available SOHO24B-ONYXLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Contact Information