Heat & Glo LifeStyle 2137-900 owner manual Assembly

Page 48

B. Vent Components Diagrams (continued)

Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm) the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a DVP-HSM-B will be required.

8 in. (203 mm)

Heat

Shield

15-1/8 in.

(384 mm)

 

Max

12 in.

Effective

(305 mm)

Length

 

SLP-TRAP

 

Horizontal Termination Cap

Term Cap

Minimum

Maximum

Effective Length

Effective Length

 

Trap1

3-1/8 in.

4-3/4 in.

79 mm

121 mm

 

Trap2

5-1/4 in.

9-1/4 in.

133 mm

235 mm

 

6-11/16 in.

3-15/16 in.

(169 mm)

(101 mm)

3-15/16 in.

3-13/16 in.

(101 mm)

(97 mm)

5-1/16 in.

8 in.(128 mm)

(203 mm)

SL-2DVP

Adapter

6-3/8 in.

163 mm

4 in.

102 mm

8-1/8 in.

206 mm

4-5/8 in.

117 mm

DVP-2SL Adapter

4-3/16 in. 106 mm

5-1/16 in. 128 mm

14-7/16 in.

367 mm

14-7/16 in. 367 mm

SLP-WT-BK

Wall Thimble-Black

26 in.

660 mm

DVP-HSM-B

2-5/16 in.Extended Heat Shield

59 mm

ASSEMBLY

SLP90 SL-2DVP

 

PVK-80

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: Use the vertical termination baffle with the PVK-80. See Figure 5.6.

(For use on Intellifire appliances only)

Figure 16.3 SLP Series Vent Components

48

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

Image 48
Contents Model Soho24B What to do if you smell gasHot glass will cause burns Congratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsInstallation to ensure maximum safety and benefit Getting StartedTools and Supplies Needed Framing and Clearances Selecting Appliance LocationMantel Projections Constructing the Appliance Chase ClearancesTermination Locations Vent Termination Minimum ClearancesSee .4 for specific clearances Covered Alcove Applications Inches U.S.AVent Information and Diagrams Vent Table KeyUse of Elbows Measuring StandardsVent Diagrams Top Vent Horizontal Termination One ElbowTwo Elbows Minimum MaximumTop Vent Horizontal Termination Three Elbows V1 Min H1 Max V2 Min H2 MaxTop Vent Vertical Termination No Elbow V1 = 45 ft Max .72 m V1 = 3 ft Min mmV1 Minimum H1 Maximum V1 + Top Vent Vertical Termination Three Elbows V1 Minimum H1+ H2 Maximum V1+ V2 MinimumVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationVertical Penetration Framing Pipe SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentInstallation of Non-combustible Facing Material MaterialSecuring and Leveling the Appliance Proper Positioning, Leveling and Securing of aInstalling Vent Pipe Assemble Vent SectionsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the wallGas Information Fuel Conversions Gas ConnectionGas Pressures Pressure Natural Gas PropaneHigh Altitude Installations Recommendation for Wire Electrical InformationJunction Box Installation GRN wire Ground attached To GRN screw with Inside boxFinishing Facing MaterialSee for combustible/non-combustible definitions Installation of Non-Combustible Facing Materials PaintingAppliance Setup Clean the ApplianceAccessories Remove Shipping MaterialsStone Placement Soho24B Positioning StonesNo Stones in this Area Glass Assembly Air Shutter SettingRemoving Glass Assembly Replacing Glass AssemblyOperating Instructions Before Lighting ApplianceLighting Instructions IPI Final inspection byFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting IntelliFire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Recommend addition of screen if one is not presentAppliance Dimension Diagram Appliance Dimensions TableReference Materials Location Inches MillimeterVent Components Diagrams SL Series Components B. Vent Components Diagrams Assembly 356 mm 330 mm 305 mm12-1/2 318 mmService Parts StockedAt Depot 24 x 24 Direct Vent Fireplace#11 IPI Valve Assembly SOHO24B-ONYX No longer availableLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Contact Information