Heat & Glo LifeStyle 2137-900 Disassemble Vent Sections, Install Decorative Ceiling Components

Page 24

D. Disassemble Vent Sections

Rotate either section (see Figure 8.7) so the seams on both pipe sections are aligned as shown in Figure 8.8.

Pull carefully to separate the pieces of pipe.

Figure 8.7 Rotate Seams for Disassembly

Figure 8.8 Align and Disassemble Vent Sections

E. Install Decorative Ceiling Components

A decorative ceiling thimble can be installed on a flat ceiling through which the vent passes. The decorative ceiling thimble is used to cover the firestop.

Seal the gap between the vent pipe and firestop using silicone with a minimum of 300ºF continuous exposure rating to prevent cold air infiltration.

Install the decorative ceiling thimble by sliding it up to the ceiling and attaching it using the provided screws.

A decorative cathedral ceiling support box can be installed on a cathedral ceiling through which the vent passes.

Use a plumb-bob to mark the center line of the venting system on the ceiling and drill a small hole through the ceiling and roof at this point. Locate the hole and mark the outline of the cathedral ceiling support box on the outside roof.

Remove shingles or other roof covering as necessary to

cut the rectangular hole for the support box. Cut the hole 1/8 in. (3 mm) larger than the support box outline.

Lower the support box through the hole in the roof until its bottom is at least 2 in. (51 mm) below the ceiling (Figure 8.9).

Level the support box both vertically and horizontally and temporarily tack it in place through the inside walls into the roof sheathing.

Use tin snips to cut the support box from the top corners down to the roof line and fold the resulting flaps to the roof. See Figure 8.10.

Nail the flaps to the roof AFTER running a bead of non hardening sealant between the flaps and the roof.

WARNING! Risk of Fire! Clean out ALL materials from inside the support box and complete the vertical vent run and termination.

LEVEL

CATHEDRAL CEILING

SUPPORT BOX

2 in. (51 mm) MIN. BELOW FINISHED CEILING

CUT HOLE 1/8 in. (3 mm)

GREATER IN SIZE THAN

PATTERN OF SUPPORT

BOX AS IT IS PROJECTED

ONTO ROOF LINE

Figure 8.9

Figure 8.10

24

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

Image 24
Contents Model Soho24B What to do if you smell gasHot glass will cause burns Congratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsInstallation to ensure maximum safety and benefit Getting StartedTools and Supplies Needed Framing and Clearances Selecting Appliance LocationMantel Projections Constructing the Appliance Chase ClearancesTermination Locations Vent Termination Minimum ClearancesSee .4 for specific clearances Covered Alcove Applications Inches U.S.AVent Information and Diagrams Vent Table KeyUse of Elbows Measuring StandardsVent Diagrams Top Vent Horizontal Termination One ElbowTwo Elbows Minimum MaximumTop Vent Horizontal Termination Three Elbows V1 Min H1 Max V2 Min H2 MaxTop Vent Vertical Termination No Elbow V1 = 45 ft Max .72 m V1 = 3 ft Min mmV1 Minimum H1 Maximum V1 + Top Vent Vertical Termination Three Elbows V1 Minimum H1+ H2 Maximum V1+ V2 MinimumVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationVertical Penetration Framing Pipe SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentInstallation of Non-combustible Facing Material MaterialSecuring and Leveling the Appliance Proper Positioning, Leveling and Securing of aInstalling Vent Pipe Assemble Vent SectionsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the wallGas Information Fuel Conversions Gas ConnectionGas Pressures Pressure Natural Gas PropaneHigh Altitude Installations Recommendation for Wire Electrical InformationJunction Box Installation GRN wire Ground attached To GRN screw with Inside boxFinishing Facing MaterialSee for combustible/non-combustible definitions Installation of Non-Combustible Facing Materials PaintingAppliance Setup Clean the ApplianceAccessories Remove Shipping MaterialsStone Placement Soho24B Positioning StonesNo Stones in this Area Glass Assembly Air Shutter SettingRemoving Glass Assembly Replacing Glass AssemblyOperating Instructions Before Lighting ApplianceLighting Instructions IPI Final inspection byFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting IntelliFire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Recommend addition of screen if one is not presentAppliance Dimension Diagram Appliance Dimensions TableReference Materials Location Inches MillimeterVent Components Diagrams SL Series Components B. Vent Components Diagrams Assembly 356 mm 330 mm 305 mm12-1/2 318 mmService Parts StockedAt Depot 24 x 24 Direct Vent Fireplace#11 IPI Valve Assembly SOHO24B-ONYX No longer availableLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Contact Information