Heat & Glo LifeStyle 2137-900 owner manual Electrical Information, Recommendation for Wire

Page 30

10 Electrical Information

A. Recommendation for Wire

This appliance requires 110-120 VAC be wired to the junction box either for proper operation of the appliance.

NOTE: This appliance must be electrically wired and grounded in accordance with local codes or, in the absence of local codes, with National Electric Code ANSI/NFPA 70-latest edition or the Canadian Electric Code, CSA C221.1.

A 110-120 VAC circuit for this product must be protected with ground-fault circuit-interrupter protection, in compliance with the applicable electrical codes, when it is installed in locations such as in bathrooms or near sinks.

B.Connecting to the Appliance

C. IntelliFire Ignition System Wiring

This appliance requires a 110 VAC supply to the appliance junction box for operation. A wiring diagram is shown in Figure 10.1.

This appliance is equipped with an IntelliFire control valve which operates on a 3 volt system.

This appliance is supplied with a 3 volt AC transformer which requires the installation of the supplied junction box. It is highly recommended that the junction box be installed at this time to avoid reconstruction.

CAUTION

Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.

WARNING

Wire 110V to electrical junction box.

Do NOT wire 110V to valve.

Do NOT wire 110V to wall switch.

Incorrect wiring will damage millivolt valves.

Incorrect wiring will override IPI safety lockout and may cause explosion.

WARNING

Shock hazard.

Replace damaged wire with type 105º C rated wire.

Wire must have high temperature insulation.

If using thermostat use one compatible with a millivolt gas valve system.

Follow parameters for locating thermostat (see individ- ual thermostat instructions) to ensure proper operation of appliance.

Use low resistance thermostat wire for wiring from igni- tion system to the wall switch and thermostat.

Keep wire lengths as short as possible by removing any excess wire length.

Low voltage and 110 VAC voltage cannot be shared within the same wall box.

Note: This appliance must be electrically wired and grounded in accordance with local codes or, in the absence of local codes, with National Electric Code ANSI/NFPA 70-latest edition or the Canadian Electric Code, CSA C221.1.

30

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

Image 30
Contents Model Soho24B What to do if you smell gasHot glass will cause burns Congratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsInstallation to ensure maximum safety and benefit Getting StartedTools and Supplies Needed Framing and Clearances Selecting Appliance LocationMantel Projections Constructing the Appliance Chase ClearancesTermination Locations Vent Termination Minimum ClearancesSee .4 for specific clearances Covered Alcove Applications Inches U.S.AUse of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsTwo Elbows Vent DiagramsTop Vent Horizontal Termination One Elbow Minimum MaximumTop Vent Horizontal Termination Three Elbows V1 Min H1 Max V2 Min H2 MaxTop Vent Vertical Termination No Elbow V1 = 45 ft Max .72 m V1 = 3 ft Min mmV1 Minimum H1 Maximum V1 + Top Vent Vertical Termination Three Elbows V1 Minimum H1+ H2 Maximum V1+ V2 MinimumWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationVertical Penetration Framing Pipe SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentInstallation of Non-combustible Facing Material MaterialSecuring and Leveling the Appliance Proper Positioning, Leveling and Securing of aInstalling Vent Pipe Assemble Vent SectionsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the wallGas Pressures Gas InformationFuel Conversions Gas Connection Pressure Natural Gas PropaneHigh Altitude Installations Recommendation for Wire Electrical InformationJunction Box Installation GRN wire Ground attached To GRN screw with Inside boxFinishing Facing MaterialSee for combustible/non-combustible definitions Installation of Non-Combustible Facing Materials PaintingAccessories Appliance SetupClean the Appliance Remove Shipping MaterialsStone Placement Soho24B Positioning StonesNo Stones in this Area Removing Glass Assembly Glass AssemblyAir Shutter Setting Replacing Glass AssemblyOperating Instructions Before Lighting ApplianceLighting Instructions IPI Final inspection byFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting IntelliFire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Recommend addition of screen if one is not presentReference Materials Appliance Dimension DiagramAppliance Dimensions Table Location Inches MillimeterVent Components Diagrams SL Series Components B. Vent Components Diagrams Assembly 12-1/2 356 mm 330 mm305 mm 318 mmAt Depot Service PartsStocked 24 x 24 Direct Vent Fireplace#11 IPI Valve Assembly SOHO24B-ONYX No longer availableLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Contact Information