Heat & Glo LifeStyle 2137-900 Install Attic Insulation Shield, Flat Ceiling Installation

Page 18

D. Install Attic Insulation Shield

WARNING! Fire Risk. DO NOT allow loose materials or insulation to touch vent. Hearth & Home Technologies Inc. requires the use of an attic shield.

The National Fuel Gas Code ANSI Z223.1 and NFPA 54 requires an attic shield constructed of 26 gauge minimum metal that extends at least 2 in. (51 mm) above insulation.

Attic shields must meet specified clearance and be secured in place.

Flat Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90° to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90° around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

Vaulted Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Cut the attic insulation shield (if application is for vaulted ceiling) to fit your ceiling pitch. Snip cut edge to recreate 1 in. bend tabs all the way around the bottom.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90º to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90º around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

BEND ALL TABS INWARD 90° TO MAINTAIN CLEARANCE AND PREVENT INSULATION FROM FALLING INSIDE

INSERT 3

SCREWS

Figure 6.5 Attic Insulation Shield

BEND 3 TABS

OUTWARD TO FASTEN TO CEILING FIRESTOP-BEND REMAINING TABS INWARD 90 DEGREES TO MAINTAIN CLEARANCE

18

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

Image 18
Contents Model Soho24B What to do if you smell gasHot glass will cause burns Congratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsInstallation to ensure maximum safety and benefit Getting StartedTools and Supplies Needed Framing and Clearances Selecting Appliance LocationMantel Projections Constructing the Appliance Chase ClearancesTermination Locations Vent Termination Minimum ClearancesSee .4 for specific clearances Covered Alcove Applications Inches U.S.AUse of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsTwo Elbows Vent DiagramsTop Vent Horizontal Termination One Elbow Minimum MaximumTop Vent Horizontal Termination Three Elbows V1 Min H1 Max V2 Min H2 MaxTop Vent Vertical Termination No Elbow V1 = 45 ft Max .72 m V1 = 3 ft Min mmV1 Minimum H1 Maximum V1 + Top Vent Vertical Termination Three Elbows V1 Minimum H1+ H2 Maximum V1+ V2 MinimumWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationVertical Penetration Framing Pipe SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentInstallation of Non-combustible Facing Material MaterialSecuring and Leveling the Appliance Proper Positioning, Leveling and Securing of aInstalling Vent Pipe Assemble Vent SectionsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the wallGas Pressures Gas InformationFuel Conversions Gas Connection Pressure Natural Gas PropaneHigh Altitude Installations Recommendation for Wire Electrical InformationJunction Box Installation GRN wire Ground attached To GRN screw with Inside boxFinishing Facing MaterialSee for combustible/non-combustible definitions Installation of Non-Combustible Facing Materials PaintingAccessories Appliance SetupClean the Appliance Remove Shipping MaterialsStone Placement Soho24B Positioning StonesNo Stones in this Area Removing Glass Assembly Glass AssemblyAir Shutter Setting Replacing Glass AssemblyOperating Instructions Before Lighting ApplianceLighting Instructions IPI Final inspection byFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting IntelliFire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Recommend addition of screen if one is not presentReference Materials Appliance Dimension DiagramAppliance Dimensions Table Location Inches MillimeterVent Components Diagrams SL Series Components B. Vent Components Diagrams Assembly 12-1/2 356 mm 330 mm305 mm 318 mmAt Depot Service PartsStocked 24 x 24 Direct Vent Fireplace#11 IPI Valve Assembly SOHO24B-ONYX No longer availableLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Contact Information