Heat & Glo LifeStyle 2137-900 owner manual Maintaining and Servicing Appliance, Maintenance Tasks

Page 43

15 Maintaining and Servicing Appliance

A. Maintenance Tasks

Although the frequency of appliance servicing and maintenance will depend on use and the type of installation, a qualified service technician should perform an appliance checkup at the beginning of each heating season.

WARNING

Risk of injury or property damage.

Before servicing:

Turn off gas.

Turn off electricity to appliance.

Disable remote control, if one is present.

Ensure appliance is completely cooled.

After servicing:

Replace any screen or barrier that was removed.

Reseal and reinstall any venting removed for servicing.

WARNING

Annual inspection by qualified technician recommended.

Check:

Condition of doors, surrounds and fronts.

Condition of glass, glass assembly and glass seal.

Obstructions of combustion and ventilation air.

Condition of logs.

Condition of firebox.

Burner ignition and operation.

Burner air shutter adjustment

Gas connections and fittings.

Obstructions of termination cap.

Clean:

• Glass

Air passageways, grilles, control compartment

Burner, burner ports

Risk of:

Fire

Delayed ignition or explosion

Exposure to combustion fumes

Odors

CAUTION

Handle glass assembly with care.

NOTE: Clean glass after initial 3-4 hours operation.

Longer operation without cleaning glass may cause a permanent white film on glass.

When cleaning glass door:

Avoid striking, scratching or slamming glass.

Do NOT use abrasive cleaners.

Use a hard water deposit glass cleaner on white film.

Do NOT clean glass when hot.

Turn off appliance after 3-4 hours of operation and

ALLOW TO COOL.

Remove and clean glass assembly.

Replace glass assembly and operate appliance for additional 12 hours.

Refer to maintenance instructions.

WARNING

Inspect external vent cap regularly.

Ensure no debris blocks cap.

Combustible materials blocking cap may ignite.

Restricted air flow affects burner operation.

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

43

Image 43
Contents What to do if you smell gas Model Soho24BHot glass will cause burns Homeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGetting Started Installation to ensure maximum safety and benefitTools and Supplies Needed Selecting Appliance Location Framing and ClearancesMantel Projections Clearances Constructing the Appliance ChaseVent Termination Minimum Clearances Termination LocationsSee .4 for specific clearances Inches U.S.A Covered Alcove ApplicationsMeasuring Standards Vent Information and DiagramsVent Table Key Use of ElbowsMinimum Maximum Vent DiagramsTop Vent Horizontal Termination One Elbow Two ElbowsV1 Min H1 Max V2 Min H2 Max Top Vent Horizontal Termination Three ElbowsV1 = 45 ft Max .72 m V1 = 3 ft Min mm Top Vent Vertical Termination No ElbowV1 Minimum H1 Maximum V1 + V1 Minimum H1+ H2 Maximum V1+ V2 Minimum Top Vent Vertical Termination Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Vertical Penetration FramingFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationMaterial Installation of Non-combustible Facing MaterialProper Positioning, Leveling and Securing of a Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent PipeSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingInstall Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination 17 Venting through the wall Install Horizontal Termination CapPressure Natural Gas Propane Gas InformationFuel Conversions Gas Connection Gas PressuresHigh Altitude Installations Electrical Information Recommendation for WireGRN wire Ground attached To GRN screw with Inside box Junction Box InstallationFacing Material FinishingSee for combustible/non-combustible definitions Painting Installation of Non-Combustible Facing MaterialsRemove Shipping Materials Appliance SetupClean the Appliance AccessoriesPositioning Stones Stone Placement Soho24BNo Stones in this Area Replacing Glass Assembly Glass AssemblyAir Shutter Setting Removing Glass AssemblyBefore Lighting Appliance Operating InstructionsFinal inspection by Lighting Instructions IPIInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit IntelliFire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksRecommend addition of screen if one is not present Inspect Maintenance TasksLocation Inches Millimeter Appliance Dimension DiagramAppliance Dimensions Table Reference MaterialsSL Series Components Vent Components Diagrams B. Vent Components Diagrams Assembly 318 mm 356 mm 330 mm305 mm 12-1/224 x 24 Direct Vent Fireplace Service PartsStocked At Depot#11 IPI Valve Assembly No longer available SOHO24B-ONYXLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Contact Information