Heat & Glo LifeStyle 2137-900 Vent Clearances and Framing, Pipe Clearances to Combustibles

Page 16

6 Vent Clearances and Framing

A. Pipe Clearances to Combustibles

WARNING

Fire Risk. Explosion Risk.

Maintain vent clearance to combustibles as specified.

Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fire.

Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm).

SLP heat shield - designed to be used on a wall 4-3/8 in. to 7-5/8 in. (111 mm to 194 mm thick).

If wall thickness is less than 4-3/8 the existing heat shields must be field trimmed. If wall thickness is greater than 7-5/8 in. a DVP- HSM-B will be required.

Heat

2-1/2 in. (64 mm)Shields top clearance at

wall shield firestops

3 in. (76 mm) top clearance

1 in. (25 mm) clearance around vertical sections

Wall

1/2 in. (13 mm) bottom

clearance at wall

Shield

shield firestops

Firestop

 

1 in. (25 mm)

WALL

clearance

 

bottom and sides

 

Figure 6.1 Horizontal venting clearances to combustible materials

B. Wall Penetration Framing

Combustible Wall Penetration

Whenever a combustible wall is penetrated, you must frame a hole for the wall shield firestop. The wall shield firestop maintains minimum clearances and prevents cold air infiltration.

The opening must be framed on all four sides using the same size framing materials as those used in the wall construction.

SLP pipe - A wall shield firestop must be placed on each side of an interior wall. A minimum 1-1/2 in. (38 mm) overlap of attached heat shields must be maintained.

See Section 8.L. for information for regarding the instal- lation of a horizontal termination cap.

Non-Combustible Wall Penetration

If the hole being penetrated is surrounded by noncom- bustible materials such as concrete, a hole with diameter one in. greater than the pipe is acceptable.

Whenever a non-combustible wall is penetrated, the wall shield firestop is only required on one side and no heat shield is necessary.

10 in. 10 in.

B

A*

A*

B

38 in.

37 in.

*Shows center of vent framing hole for top venting. The center of the hole is one (1) inch (25.4 mm) above the center of the horizontal vent pipe.

Figure 6.2 Exterior Wall Hole

16

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

Image 16
Contents What to do if you smell gas Model Soho24BHot glass will cause burns Congratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGetting Started Installation to ensure maximum safety and benefitTools and Supplies Needed Selecting Appliance Location Framing and ClearancesMantel Projections Constructing the Appliance Chase ClearancesVent Termination Minimum Clearances Termination LocationsSee .4 for specific clearances Covered Alcove Applications Inches U.S.AVent Information and Diagrams Vent Table KeyUse of Elbows Measuring StandardsVent Diagrams Top Vent Horizontal Termination One ElbowTwo Elbows Minimum MaximumTop Vent Horizontal Termination Three Elbows V1 Min H1 Max V2 Min H2 MaxV1 = 45 ft Max .72 m V1 = 3 ft Min mm Top Vent Vertical Termination No ElbowV1 Minimum H1 Maximum V1 + Top Vent Vertical Termination Three Elbows V1 Minimum H1+ H2 Maximum V1+ V2 MinimumVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationVertical Penetration Framing Pipe SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Top VentInstallation of Non-combustible Facing Material MaterialSecuring and Leveling the Appliance Proper Positioning, Leveling and Securing of aInstalling Vent Pipe Assemble Vent SectionsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the wallGas Information Fuel Conversions Gas ConnectionGas Pressures Pressure Natural Gas PropaneHigh Altitude Installations Recommendation for Wire Electrical InformationJunction Box Installation GRN wire Ground attached To GRN screw with Inside boxFacing Material FinishingSee for combustible/non-combustible definitions Installation of Non-Combustible Facing Materials PaintingAppliance Setup Clean the ApplianceAccessories Remove Shipping MaterialsStone Placement Soho24B Positioning StonesNo Stones in this Area Glass Assembly Air Shutter SettingRemoving Glass Assembly Replacing Glass AssemblyOperating Instructions Before Lighting ApplianceLighting Instructions IPI Final inspection byInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit IntelliFire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Recommend addition of screen if one is not presentAppliance Dimension Diagram Appliance Dimensions TableReference Materials Location Inches MillimeterVent Components Diagrams SL Series Components B. Vent Components Diagrams Assembly 356 mm 330 mm 305 mm12-1/2 318 mmService Parts StockedAt Depot 24 x 24 Direct Vent Fireplace#11 IPI Valve Assembly SOHO24B-ONYX No longer availableLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Contact Information