Heat & Glo LifeStyle 2137-900 Top Vent Vertical Termination No Elbow, V1 Minimum H1 Maximum V1 +

Page 14

2.Top Vent - Vertical Termination No Elbow

V1 = 45 ft Max. (13.72 m) V1 = 3 ft Min. (914 mm)

V1

Note: The vertical termination baffle should be used for runs of 7 feet or greater. Use the vertical termination baffle for these applications:

Extended vertical vent runs

Extended vertical and horizontal vent runs with PVK-80 Power Vent.

The vertical restrictor has a break away portion that creates a larger hole. If venting 7-15 feet, the break away portion MUST be removed and the larger hole must be used. If venting over 15 feet, the break away portion should be left in place and the small hole should be used. For PVK-80 Power Vent ap- plications, the break away portion should be left in place and the small hole should be used.

Figure 5.6

BREAK AWAY PORTION

VERTICAL TERMINATION BAFFLE

Two Elbows

V1 Minimum

 

 

 

 

H1 Maximum

V2

V1 + V2

Minimum

 

One Elbow

 

 

 

1-1/2 ft.

457 mm

*

*

*

 

1/2 ft.

152 mm

 

2 ft.

610 mm

*

*

*

 

1-1/2 ft.

457 mm

 

3 ft.

914 mm

*

*

*

 

2-1/2 ft.

762 mm

 

5 ft.

1.5 m

*

*

*

 

3-1/2 ft.

1.1 m

 

 

7 ft.

2.1 m

*

*

*

 

5-1/2 ft.

1.7 m

 

 

15 ft.

4.6 m

*

*

*

 

 

 

 

V1 + V2 + H1 = 38 ft. (11.6 m) Max.

 

 

 

V2

*No specific restrictions on this value EXCEPT

 

 

V

1

+ V

2

+ H

1

cannot exceed 38 ft. (11.6 m)

 

 

 

 

 

 

 

 

 

 

 

H1

V1

Figure 5.7

14

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

Image 14
Contents Hot glass will cause burns Model Soho24BWhat to do if you smell gas Congratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsTools and Supplies Needed Installation to ensure maximum safety and benefitGetting Started Mantel Projections Framing and ClearancesSelecting Appliance Location Constructing the Appliance Chase ClearancesSee .4 for specific clearances Termination LocationsVent Termination Minimum Clearances Covered Alcove Applications Inches U.S.AUse of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsTwo Elbows Vent DiagramsTop Vent Horizontal Termination One Elbow Minimum MaximumTop Vent Horizontal Termination Three Elbows V1 Min H1 Max V2 Min H2 MaxV1 Minimum H1 Maximum V1 + Top Vent Vertical Termination No ElbowV1 = 45 ft Max .72 m V1 = 3 ft Min mm Top Vent Vertical Termination Three Elbows V1 Minimum H1+ H2 Maximum V1+ V2 MinimumWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationVertical Penetration Framing Pipe SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentInstallation of Non-combustible Facing Material MaterialSecuring and Leveling the Appliance Proper Positioning, Leveling and Securing of aInstalling Vent Pipe Assemble Vent SectionsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components Install Horizontal Termination Cap 17 Venting through the wallGas Pressures Gas InformationFuel Conversions Gas Connection Pressure Natural Gas PropaneHigh Altitude Installations Recommendation for Wire Electrical InformationJunction Box Installation GRN wire Ground attached To GRN screw with Inside boxSee for combustible/non-combustible definitions FinishingFacing Material Installation of Non-Combustible Facing Materials PaintingAccessories Appliance SetupClean the Appliance Remove Shipping MaterialsStone Placement Soho24B Positioning StonesNo Stones in this Area Removing Glass Assembly Glass AssemblyAir Shutter Setting Replacing Glass AssemblyOperating Instructions Before Lighting ApplianceLighting Instructions IPI Final inspection byAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Sympton Possible Cause Corrective Action TroubleshootingIntelliFire Ignition System Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Recommend addition of screen if one is not presentReference Materials Appliance Dimension DiagramAppliance Dimensions Table Location Inches MillimeterVent Components Diagrams SL Series Components B. Vent Components Diagrams Assembly 12-1/2 356 mm 330 mm305 mm 318 mmAt Depot Service PartsStocked 24 x 24 Direct Vent Fireplace#11 IPI Valve Assembly SOHO24B-ONYX No longer availableLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Contact Information