Regency P33-LP3, P33-NG3 installation manual Vent terminal Air supply outlet

Page 10

Vertical Termination

24"

D

E

V

Inside corner detail

G

V

A

Vertical

Termination

24"

18"

V

EXTERIOR

INSTALLATION

B

V

M

.

C

 

V

Fixed

 

 

Closed

F

V

Openable

 

B

V

Openable

B

Fixed Closed

 

H

V

 

B

N

 

L

VENT

B

B

V

K

A

 

j

 

 

 

A

 

V

A

V

Vent terminal

A

Air supply outlet

 

Area where terminal is not permited

 

 

 

 

Regency P33-3 Zero Clearance Direct

A= Clearance above grade, veranda, porch, deck, or balcony *(min. 12"/30cm) B= Clearance to window or door that may be opened *(12"/30cm) #(9"/23cm) C= Clearance to permanently closed window *(min. 12"/30cm)

D= Vertical clearance to ventilated soffit located above the terminal within a horizontal distance of (24"/60cm) from the centerline of the terminal (min. 18"/46cm) check with local code.

E= Clearance to unventilated soffit (min. 15"/38cm)

F= Clearance to outside corner: with AstroCap Termination Cap (min. 6"/15cm), with Dura-Vent Termination Cap (12"/30cm)

G= Clearance to inside corner: with AstroCap Termination Cap (min. 6"/15cm), with Dura- Vent Termination Cap (12"/30cm)

H= Not to be installed above a meter/regulator assembly within (3'/90cm) horizontally from the centerline of the regulator.

J= Clearance to service regulator vent outlet *(min. 36"/90cm)

K= Clearance to non-mechanical air supply inlet to building or the combustion air inlet to any other appliance *(12"/30cm) #(9"/23cm)

L= Clearance to a mechanical air supply inlet *(min. 72"/1.8m) #3' (91cm) above if within 10' (3m) horizontally.

M= Clearance above paved sidewalk or a paved driveway located on public property *(min. 84"/2.1m)

N= Clearance under veranda, porch, deck, or balcony *(min. 12"/30cm)

TERMINATION LOCATIONS

Vent Gas Fireplace

Note:

-A vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings.

-Only permitted if veranda, porch, deck, or balcony is fully open on a minimum of two sides beneath the floor.

-If the vent termination is accessible, a certified guard shall be installed.

*As specified in CGA B149 Installation Code. Note: Local codes or regulations may require different clearances.

# In accordance with the current ANSI Z223.1/NFPA 54, Natioinal Fuel Gas Code.

Image 10
Contents P33-3 Zero Clearance Information for MOBILE/MANUFACTURED Homes After First Sale To the New OwnerTable of Contents Safety Label Save These Instructions InstallationGeneral Safety Information Before YOU StartLocating Your GAS Stove Installation ChecklistUnit Dimensions Duct System OptionClearances are not adhered to Clearancescombustible MantelsMantel LEG Clearances Fire hazard is an extreme risk if theseSimpson Dura-Vent Minimum Clearances Framing and FinishingRear Termination Vertical Termination or Vertical Rise with HorizontalVenting Introduction Unit Assembly Prior to InstallationTop Standoff Assembly Top Facing Support Side Nailing StripsVent Vent terminal Air supply outletRegency Direct Vent System Flex Horizontal Terminations only Installation Procedures For Regency Direct Vent System FlexMax. Wall Vent Length Flat Wall InstallationRigid Pipe Venting Systems Thickness inches Required inchesDescription Simpson Dura-Vent Selkirk Rigid Pipe Venting Components ListDirect VentGS R Direct-Temp TM Rigid Pipe Venting Arrangements Vertical Terminations Propane & Natural GasInstallation Rigid Pipe Venting Arrangements Horizontal Terminations Regency Direct Vent System FlexHorizontal Venting with Three 3 90o Elbows Horizontal Venting with Two 2 90o ElbowsOption + H1 Option Vertical Venting with Two 2 90o ElbowsOption + V1 H + H1 + V1 With these options, max. totalVertical Venting with Three 3 90o Elbows Description Vertical Termination With CO-LINEAR Flex SystemRequired Parts Alternate Approved CapsInstallation Below Grade Snorkel Installation Horizontal InstallationsSnorkel Terminations GAS Line Installation Vertical TerminationHigh Elevation Pilot AdjustmentGAS Pipe Pressure Testing T. Valve DescriptionConversion Kit Contains Notch LOG SET InstallationOptional Brick Panels BracketBracketCutout Standard Flush DoorOptional Flush Trim 5th Grate TabOptional BAY Door Flush LouversDouble Screen Door Bay louvers Must be used With the Bay glass optionBay Louver Top Heat Shield BAY LouversFlush Louver Top Heat Shield Burner ON/OFF Control boxCut-Out Oblong Hole Top Flange Bottom Full Screen FrontCut-Outs Hinge Location Bottom Grill Top GrillOptional Wall Switch Thermostat Wire TableWiring Diagram Do not cut the ground terminal off under any circumstancesDiagram Secure left side with 2 screws Installing the Optional FANShut the power off Secure the 2 boxes together With one screwOperating Instructions Copy of the Lighting Plate InstructionsAeration Adjustment Lighting ProcedureShutdown Procedure Operating InstructionsLOG Replacement MaintenanceMaintenance Instructions Normal Operating Sounds GAS AppliancesGlass Gasket Flush Glass ReplacementThermopile Thermocouple Door GlassRemoving Valve Installing ValveDiagram 3 Lift out Valve Tray Assembly Shut off the gas supplyParts List DescriptionParts List Burner & Log Assembly Part DescriptionFlush Front & Louvers Bay Front & Louvers Regency P33-3 Zero Clearance Direct Vent Gas Fireplace Warranty ConditionsInstaller Please complete the following information