Regency P33-NG3, P33-LP3 installation manual Clearancescombustible Mantels, Mantel LEG Clearances

Page 7

INSTALLATION

CLEARANCESCOMBUSTIBLE MANTELS

The clearances listed below are Minimum dis- Because of the extreme heat this fireplace emits, the mantel clearances are critical. Com-

tances unless otherwise stated:

bustible mantel clearances from top of unit are shown in the diagram below.

A major cause of chimney related fires is

Note: A non-combustible mantel may be installed at a lower height if the framing is made

failure to maintain required clearances (air

of metal studs covered with a non-combustible board.

space) to combustible materials. It is of the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

greatest importance that this fireplace and

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

vent system be installed only in accordance

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

with these instructions.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clearance to Combustibles from:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Back

0"

(0mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Side

0"

(0mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Floor

0"

(0mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: The minimum fl oor clearance must be

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

maintained from the top surface of the carpet-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ing, tile, etc.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Minimum Clearance from Top of Unit to:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mantel*

min. 7" (177mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ceiling

30"

(762mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

from top of unit.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Side Wall Clearance

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Bay or Flush Front

7-1/2"

(191mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Minimum Vent Clearances:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2-1/2" (64mm) Horizontal Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1-1/2" (38mm) Horizontal Side

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1-1/2" (38mm) Horizontal Bottom

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1-1/4" (32mm) Vertical Vent Clearance (Simpson)

1-1/2" (38mm) Vertical Vent Clearance (Flex)

 

 

 

 

Alcove Clearances:

 

 

Max. Depth

36"

(914mm)

Min. Width

48"

(1219mm)

Min. Height

59"

(1499mm)

* see mantel clearance instructions.

This drawing is to scale at 1:6 (one inch = 6 inches). Mantel can be installed anywhere in shaded area or higher using the above scale.

 

 

Note: Ensure the paint that is used on the mantel and the facing is "heat resistant" or the

 

 

 

paint may discolour.

WARNING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fire hazard is an extreme risk if these

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MANTEL LEG CLEARANCES

clearances are not adhered to.

 

 

 

 

 

 

 

 

Combustible mantel leg clearances as per diagram below:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Maximum

1-1/2" projection at 2" minimum clearance.

Clearances for Bay or Flush Front

TheHeatWaveDuctKithasdifferentclear- ance and framing requirements, check the HeatWave manual for details.

Regency P33-3 Zero Clearance Direct Vent Gas Fireplace

Image 7
Contents P33-3 Zero Clearance To the New Owner Information for MOBILE/MANUFACTURED Homes After First SaleTable of Contents Safety Label Before YOU Start InstallationGeneral Safety Information Save These InstructionsDuct System Option Installation ChecklistUnit Dimensions Locating Your GAS StoveFire hazard is an extreme risk if these Clearancescombustible MantelsMantel LEG Clearances Clearances are not adhered toVertical Termination or Vertical Rise with Horizontal Framing and FinishingRear Termination Simpson Dura-Vent Minimum ClearancesTop Facing Support Side Nailing Strips Unit Assembly Prior to InstallationTop Standoff Assembly Venting IntroductionVent terminal Air supply outlet VentRegency Direct Vent System Flex Horizontal Terminations only For Regency Direct Vent System Flex Installation ProceduresThickness inches Required inches Flat Wall InstallationRigid Pipe Venting Systems Max. Wall Vent LengthDescription Simpson Dura-Vent Selkirk Rigid Pipe Venting Components ListDirect VentGS R Direct-Temp TM Propane & Natural Gas Rigid Pipe Venting Arrangements Vertical TerminationsInstallation Regency Direct Vent System Flex Rigid Pipe Venting Arrangements Horizontal TerminationsHorizontal Venting with Three 3 90o Elbows Horizontal Venting with Two 2 90o ElbowsOption + H1 + V1 With these options, max. total Vertical Venting with Two 2 90o ElbowsOption + V1 H + H1 OptionVertical Venting with Three 3 90o Elbows Alternate Approved Caps Vertical Termination With CO-LINEAR Flex SystemRequired Parts DescriptionInstallation Below Grade Snorkel Installation Horizontal InstallationsSnorkel Terminations Vertical Termination GAS Line InstallationT. Valve Description Pilot AdjustmentGAS Pipe Pressure Testing High ElevationConversion Kit Contains BracketBracket LOG SET InstallationOptional Brick Panels Notch5th Grate Tab Standard Flush DoorOptional Flush Trim CutoutBay louvers Must be used With the Bay glass option Flush LouversDouble Screen Door Optional BAY DoorBurner ON/OFF Control box BAY LouversFlush Louver Top Heat Shield Bay Louver Top Heat ShieldCut-Out Oblong Hole Top Flange Bottom Full Screen FrontCut-Outs Top Grill Hinge Location Bottom GrillThermostat Wire Table Optional Wall SwitchDo not cut the ground terminal off under any circumstances Wiring DiagramSecure the 2 boxes together With one screw Installing the Optional FANShut the power off Diagram Secure left side with 2 screwsCopy of the Lighting Plate Instructions Operating InstructionsOperating Instructions Lighting ProcedureShutdown Procedure Aeration AdjustmentNormal Operating Sounds GAS Appliances MaintenanceMaintenance Instructions LOG ReplacementDoor Glass Flush Glass ReplacementThermopile Thermocouple Glass GasketShut off the gas supply Installing ValveDiagram 3 Lift out Valve Tray Assembly Removing ValveDescription Parts ListParts List Part Description Burner & Log AssemblyFlush Front & Louvers Bay Front & Louvers Regency P33-3 Zero Clearance Direct Vent Gas Fireplace Conditions WarrantyInstaller Please complete the following information