Regency P33-NG3, P33-LP3 installation manual Table of Contents

Page 3

TABLE OF CONTENTS

P33-3 ZERO CLEARANCE

DIRECT VENT GAS FIREPLACE

 

Page

Safety Label

 

Safety Label

4

Installation

 

Important Message

5

Before You Start

5

General Safety Information

5

Manufactured Home Additional Requirements

5

Installation Checklist

6

Unit Dimensions

6

HeatWave Duct System Option

6

Locating Your Gas Stove

6

Clearances

7

Combustible Mantel Clearances

7

Mantel Leg Clearances

7

Framing and Finishing

8

Unit Assembly Prior to Installation

9

Venting Introduction

9

Exterior Vent Termination Locations

10

Venting - Regency Direct Vent System (Flex)

 

Horizontal Terminations only

11

Venting - Installation of Regency Direct Vent

 

System (Flex)

12

Venting - Rigid Pipe Venting Systems

13

Rigid Pipe Venting Components List

14

Venting Arrangements - Vertical Terminations

15

Venting Arrangements - Horizontal Terminations .... 17

Vertical Terminations - Co-Linear Flex System

21

Venting Arrangements

22

Venting - Horizontal Installations

23

Venting - Vertical Termination

24

Gas Line Installation

24

Pilot Adjustment

25

High Elevation

25

System Data

25

Gas Pipe Pressure Test

25

SIT Valve Description

25

Conversion to Propane

26

Optional Brick Panels

27

Log Installation

27

Flush Door - Standard

28

Flush Trim (optional)

28

 

Page

Louvers - Flush

29

Double Screen Door

29

Bay Front (optional)

29

Bay Trim (optional)

29

Louvers - Bay

30

Full Screen Front

31

Remote Control (optional)

33

Wall Thermostat (optional)

33

Remote Wall Switch (optional)

33

Wiring Diagram

34

Fan Installation (optional)

35

Operating Instructions

 

Lighting Plate Instructions

36

Operating Instructions

37

Lighting Procedure

37

Shutdown Procedure

37

First Fire

37

Aeration Adjustment

37

Normal Operating Sounds of

 

Gas Appliances

38

Maintenance

 

Maintenance Instructions

38

General Vent Maintenance

38

Gold-Plated or Brass Louvers

38

Gold Plated or Brass Trim

38

Log Replacement

38

Thermopile/Thermocouple

39

Glass Gasket

39

Door Glass: Flush and Bay Glass

39

Removing Valve

40

Installing Valve

40

Parts List

 

Replacement/Spare Parts List

41

Warranty

 

Warranty

47

Regency P33-3 Zero Clearance Direct Vent Gas Fireplace

Image 3
Contents P33-3 Zero Clearance To the New Owner Information for MOBILE/MANUFACTURED Homes After First SaleTable of Contents Safety Label Before YOU Start InstallationGeneral Safety Information Save These InstructionsDuct System Option Installation ChecklistUnit Dimensions Locating Your GAS StoveFire hazard is an extreme risk if these Clearancescombustible MantelsMantel LEG Clearances Clearances are not adhered toVertical Termination or Vertical Rise with Horizontal Framing and FinishingRear Termination Simpson Dura-Vent Minimum ClearancesTop Facing Support Side Nailing Strips Unit Assembly Prior to InstallationTop Standoff Assembly Venting IntroductionVent terminal Air supply outlet VentRegency Direct Vent System Flex Horizontal Terminations only For Regency Direct Vent System Flex Installation ProceduresThickness inches Required inches Flat Wall InstallationRigid Pipe Venting Systems Max. Wall Vent LengthRigid Pipe Venting Components List Description Simpson Dura-Vent SelkirkDirect VentGS R Direct-Temp TM Propane & Natural Gas Rigid Pipe Venting Arrangements Vertical TerminationsInstallation Regency Direct Vent System Flex Rigid Pipe Venting Arrangements Horizontal TerminationsHorizontal Venting with Two 2 90o Elbows Horizontal Venting with Three 3 90o ElbowsOption + H1 + V1 With these options, max. total Vertical Venting with Two 2 90o ElbowsOption + V1 H + H1 OptionVertical Venting with Three 3 90o Elbows Alternate Approved Caps Vertical Termination With CO-LINEAR Flex SystemRequired Parts DescriptionInstallation Horizontal Installations Below Grade Snorkel InstallationSnorkel Terminations Vertical Termination GAS Line InstallationT. Valve Description Pilot AdjustmentGAS Pipe Pressure Testing High ElevationConversion Kit Contains BracketBracket LOG SET InstallationOptional Brick Panels Notch5th Grate Tab Standard Flush DoorOptional Flush Trim CutoutBay louvers Must be used With the Bay glass option Flush LouversDouble Screen Door Optional BAY DoorBurner ON/OFF Control box BAY LouversFlush Louver Top Heat Shield Bay Louver Top Heat ShieldFull Screen Front Cut-Out Oblong Hole Top Flange BottomCut-Outs Top Grill Hinge Location Bottom GrillThermostat Wire Table Optional Wall SwitchDo not cut the ground terminal off under any circumstances Wiring DiagramSecure the 2 boxes together With one screw Installing the Optional FANShut the power off Diagram Secure left side with 2 screwsCopy of the Lighting Plate Instructions Operating InstructionsOperating Instructions Lighting ProcedureShutdown Procedure Aeration AdjustmentNormal Operating Sounds GAS Appliances MaintenanceMaintenance Instructions LOG ReplacementDoor Glass Flush Glass ReplacementThermopile Thermocouple Glass GasketShut off the gas supply Installing ValveDiagram 3 Lift out Valve Tray Assembly Removing ValveDescription Parts ListParts List Part Description Burner & Log AssemblyFlush Front & Louvers Bay Front & Louvers Regency P33-3 Zero Clearance Direct Vent Gas Fireplace Conditions WarrantyInstaller Please complete the following information