Regency P33-LP3, P33-NG3 installation manual Installation

Page 16

INSTALLATION

The P33-3 is approved for a maximum 40 ft. straight vertical, with rigid pipe vent systems for Propane and Natural Gas.

The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations with rigid pipe vent systems for Propane and Natural Gas. Maximum two 45o elbows allowed.

Vent must be supported at offsets.

Firestops are required at each floor level and whenever passing through a wall.

Maintain clearances to combustibles.

Regency P33-3 Zero Clearance Direct Vent Gas Fireplace

Image 16
Contents P33-3 Zero Clearance Information for MOBILE/MANUFACTURED Homes After First Sale To the New OwnerTable of Contents Safety Label Installation General Safety InformationSave These Instructions Before YOU StartInstallation Checklist Unit DimensionsLocating Your GAS Stove Duct System OptionClearancescombustible Mantels Mantel LEG ClearancesClearances are not adhered to Fire hazard is an extreme risk if theseFraming and Finishing Rear TerminationSimpson Dura-Vent Minimum Clearances Vertical Termination or Vertical Rise with HorizontalUnit Assembly Prior to Installation Top Standoff AssemblyVenting Introduction Top Facing Support Side Nailing StripsVent Vent terminal Air supply outletRegency Direct Vent System Flex Horizontal Terminations only Installation Procedures For Regency Direct Vent System FlexFlat Wall Installation Rigid Pipe Venting SystemsMax. Wall Vent Length Thickness inches Required inchesDescription Simpson Dura-Vent Selkirk Rigid Pipe Venting Components ListDirect VentGS R Direct-Temp TM Rigid Pipe Venting Arrangements Vertical Terminations Propane & Natural GasInstallation Rigid Pipe Venting Arrangements Horizontal Terminations Regency Direct Vent System FlexHorizontal Venting with Three 3 90o Elbows Horizontal Venting with Two 2 90o ElbowsOption + H1 Vertical Venting with Two 2 90o Elbows Option + V1 H + H1Option + V1 With these options, max. totalVertical Venting with Three 3 90o Elbows Vertical Termination With CO-LINEAR Flex System Required PartsDescription Alternate Approved CapsInstallation Below Grade Snorkel Installation Horizontal InstallationsSnorkel Terminations GAS Line Installation Vertical TerminationPilot Adjustment GAS Pipe Pressure TestingHigh Elevation T. Valve DescriptionConversion Kit Contains LOG SET Installation Optional Brick PanelsNotch BracketBracketStandard Flush Door Optional Flush TrimCutout 5th Grate TabFlush Louvers Double Screen DoorOptional BAY Door Bay louvers Must be used With the Bay glass optionBAY Louvers Flush Louver Top Heat ShieldBay Louver Top Heat Shield Burner ON/OFF Control boxCut-Out Oblong Hole Top Flange Bottom Full Screen FrontCut-Outs Hinge Location Bottom Grill Top GrillOptional Wall Switch Thermostat Wire TableWiring Diagram Do not cut the ground terminal off under any circumstancesInstalling the Optional FAN Shut the power offDiagram Secure left side with 2 screws Secure the 2 boxes together With one screwOperating Instructions Copy of the Lighting Plate InstructionsLighting Procedure Shutdown ProcedureAeration Adjustment Operating InstructionsMaintenance Maintenance InstructionsLOG Replacement Normal Operating Sounds GAS AppliancesFlush Glass Replacement Thermopile ThermocoupleGlass Gasket Door GlassInstalling Valve Diagram 3 Lift out Valve Tray AssemblyRemoving Valve Shut off the gas supplyParts List DescriptionParts List Burner & Log Assembly Part DescriptionFlush Front & Louvers Bay Front & Louvers Regency P33-3 Zero Clearance Direct Vent Gas Fireplace Warranty ConditionsInstaller Please complete the following information