Regency P33-NG3, P33-LP3 Optional Brick Panels, LOG SET Installation, Notch, BracketBracket

Page 27

INSTALLATION

OPTIONAL BRICK

PANELS

1)Undo the bottom 2 door latches and open and remove glass door. Remove logs.

2)Attach the 2 Rear Brick Retaining clips to the rear wall. Loosen the screws in the top and rear wall of the fi rebox and slide the retaining clips into position (tight against the fi rebox top) and then tighten the screws.

LOG SET INSTALLATION

D) 251

A) 250

Readtheinstructionsbelowcarefully and refer to the diagrams. If logs are broken do not use the unit until they are replaced. Broken logs can interfere with the pilot operation.

Log Kit # 431-930 contains the fol-

The 3-digit numbers (i.e. 250) are molded into the rear of each log.

C) 253

B) 254

E) 252

Note: The logs must not be in the unit.

3)Insert the back brick panel by carefully slip- ping it between the back wall of the fi rebox and the rear log bracket.

4)Put the side panels in next. Slide them in from the front and push them fl at up against the wall. Be very careful not to scratch them on the fi rebox hardware.

lowing pieces:

 

A)

250

Rear Log

902-250

B)

254

Middle Cross Log

902-254

C)

253

Front Left Cross Log

902-253

D)

251

Rear Left Log

902-251

E)

252

Front Right Cross Log

902-252

F)

 

Embers

902-156

G)

 

Vermiculite

902-179/21

H)

 

Rockwool

902-153

NOTE: If you will be installing the optional Brick Panels, install the Brick Panels prior to installing the logs.

1)Carefully remove the logs from the box and unwrap them. The logs are fragile, handle with care - do not force into position.

2)Sprinkle the vermiculite and embers around the fi rebox base.

4)Place Log 254 on the front right side of the burner. Push the back of the log against the 2 brackets with the notch on the bottom right side of the log fi tting into the right side of the grate.

Notch

254

BracketBracket

250

254

5)Slide the Top Brick Panel into position and slide the Top Brick Retaining clips so that they hold the Top Brick Panel in place and tighten down the screws.

5) Position Log 253 across the cutouts in Logs

Vermiculite Vermiculite Vermiculite 250 and 254 with the notch on the left side of the log fi tting into the 2nd grate tab.

3) Place the Log 250 on the rear log support

pins with the fl at side to the back.

Cutouts

 

 

253

250

 

 

250

 

254

 

2nd Grate Tab

Regency P33-3 Zero Clearance Direct Vent Gas Fireplace

Image 27
Contents P33-3 Zero Clearance To the New Owner Information for MOBILE/MANUFACTURED Homes After First SaleTable of Contents Safety Label Before YOU Start InstallationGeneral Safety Information Save These InstructionsDuct System Option Installation ChecklistUnit Dimensions Locating Your GAS StoveFire hazard is an extreme risk if these Clearancescombustible MantelsMantel LEG Clearances Clearances are not adhered toVertical Termination or Vertical Rise with Horizontal Framing and FinishingRear Termination Simpson Dura-Vent Minimum ClearancesTop Facing Support Side Nailing Strips Unit Assembly Prior to InstallationTop Standoff Assembly Venting IntroductionVent terminal Air supply outlet VentRegency Direct Vent System Flex Horizontal Terminations only For Regency Direct Vent System Flex Installation ProceduresThickness inches Required inches Flat Wall InstallationRigid Pipe Venting Systems Max. Wall Vent LengthRigid Pipe Venting Components List Description Simpson Dura-Vent SelkirkDirect VentGS R Direct-Temp TM Propane & Natural Gas Rigid Pipe Venting Arrangements Vertical TerminationsInstallation Regency Direct Vent System Flex Rigid Pipe Venting Arrangements Horizontal TerminationsHorizontal Venting with Two 2 90o Elbows Horizontal Venting with Three 3 90o ElbowsOption + H1 + V1 With these options, max. total Vertical Venting with Two 2 90o ElbowsOption + V1 H + H1 OptionVertical Venting with Three 3 90o Elbows Alternate Approved Caps Vertical Termination With CO-LINEAR Flex SystemRequired Parts DescriptionInstallation Horizontal Installations Below Grade Snorkel InstallationSnorkel Terminations Vertical Termination GAS Line InstallationT. Valve Description Pilot AdjustmentGAS Pipe Pressure Testing High ElevationConversion Kit Contains BracketBracket LOG SET InstallationOptional Brick Panels Notch5th Grate Tab Standard Flush DoorOptional Flush Trim CutoutBay louvers Must be used With the Bay glass option Flush LouversDouble Screen Door Optional BAY DoorBurner ON/OFF Control box BAY LouversFlush Louver Top Heat Shield Bay Louver Top Heat ShieldFull Screen Front Cut-Out Oblong Hole Top Flange BottomCut-Outs Top Grill Hinge Location Bottom GrillThermostat Wire Table Optional Wall SwitchDo not cut the ground terminal off under any circumstances Wiring DiagramSecure the 2 boxes together With one screw Installing the Optional FANShut the power off Diagram Secure left side with 2 screwsCopy of the Lighting Plate Instructions Operating InstructionsOperating Instructions Lighting ProcedureShutdown Procedure Aeration AdjustmentNormal Operating Sounds GAS Appliances MaintenanceMaintenance Instructions LOG ReplacementDoor Glass Flush Glass ReplacementThermopile Thermocouple Glass GasketShut off the gas supply Installing ValveDiagram 3 Lift out Valve Tray Assembly Removing ValveDescription Parts ListParts List Part Description Burner & Log AssemblyFlush Front & Louvers Bay Front & Louvers Regency P33-3 Zero Clearance Direct Vent Gas Fireplace Conditions WarrantyInstaller Please complete the following information