1.7Pipe system

1.7.1 Location of pipelines/general instructions

-The pump station and outlet points should be placed so that the lines become as short as possible.

-The line should be arranged with as few bends as possible.

-Sometimes it may pay to split the line close to the pump station so the lengths conducting large volumes of water become as short as possible. A centre location of the pump station in relation to the outlet points would also lead to smaller pipe dimensions.

-Pipe lines should be placed on walls of tile or concrete, otherwise great care should be taken (reinforcement plates etc.)

-Pipe lines should be placed so that damage is prevented (collision, frost, extreme attacks of corrosion, etc.)

-Pipe lines should be fitted in a visual location everywhere or so that they may easily be inspected. Lines should not be incorporated in walls or floors. When leading through walls be careful not to enclosed. (Special lead-in bushes are available)

-The outlet points should be placed as close to the operation point as possible and so that a hose length preferably of 20 m is used.

1.7.2 Types of pipes - standards

Seamless pipes of precision steel are used for the pipe system according to DIN 2391/C of St. 35.4 material quality, normalized, bright annealed and electro galvanized

or welded steel pipes, stainless, calibrated and glowed according to DIN 2463 - 1.401 d3-- (DIN 17457 cl. 1).

Alternatively, seamless pipes of precision steel in dimensions according to DIN 2391 and stainless material quality e.g. Werkstoff no. 1.4301, 1.4436 or 1.4571. Comparable qualities to Swedish standards are SIS 2333 or SIS 2343.

Pipe dimensions:

The following sizes are used with electro galvanized precision steel pipes:

-15x2

-22x2.5

-30x4

The following sizes are used with stainless precision steel pipes:

-15x1.5

-22x2

-30x3

In connection with branches close to the pump station it should be possible to avoid the 30 dimension for most 44C3 systems. For 160 bar systems fittings with a permissible working pres- sure of min. ND 160 bar are to be used.

Please note that the pipe dimension 30 according to DIN 2353 is used together with a stronger type of fitting (S-series) and pipe systems with this dimension therefore become more expensive than e.g. an 22 line - particularly in multi-pump systems.

15

Image 15
Contents Deltabooster Deltabooster How to use the Deltabooster Layout of system Product DescriptionPage Model survey and main functions Deltabooster switchboardC3K pumps Selection of Spray Lance Selection of systemNumber of Pumps Line PressureIdentification of model Technical dataClassifica Control systemWater tank 2 C3K pumpNo. of pumps Model 44C3 Dimensions, weight and total performance per systemLocation of the Deltabooster Differential pressure of solenoid valve measured in bar Installation requirements for water connectionInstallation requirements for mains power connection Deltabooster control systemMax 125 a Pipe system Location of pipelines/general instructionsTypes of pipes standards Fittings, standards TuyauteriePipingComponents RørledningskomponenterRohrleitungskomponenten-Elements Bezeichnung Designation DimensionRohrhalterung tuyauSupport Bezeichnung DesignationdimensionKobber Copper Rohrleitungskomponenten-ElementsDimensioning of pipe systems Page Bar ExamplesExample 50 m 40 m 70 m Pressure DropDrop Example 60 m30 m 10 m M 80 m PressureExample 20 m 40 m 30 m 60 m 30 m 15 m 80 m Ring systemBar 10 bar Compensation Temperature compensationMounting requirements and hints Bends/hose connectionsMounting of Pipe LINES/GENERAL Instructions Fixation AT Corners and TEE ConnectorsRemounting Mounting in Connection SocketOutlet Station Outlet points and accessoriesDetachable foam injector AccessoriesMultipressure spray lance system Bar black nozzle protectionBar grey nozzle protection Location Sketch Mounting base Connection of inlet water Control of filter in water tankFilter Page Venting of pumps Starting up/runningOil control StartVenting of pipe system Adjustment of line pressureSave these instructions for later How to use the DeltaboosterSafety Do not Interfere with this SettingModel survey Functional diagram Main / emergency switch Control switch / starting switch and stopping switchInstrument panel Control panel Setting and reading of Deltabooster On 50C Setting of water temperatureBoth should be on for the operation of a single plant Connection and disconnection of C3K pumpsReading of hour meters Starting up/running in cf. Fig Page Multipressure spray lance system Operation after starting up Operation after starting up outlet points and equipmentAfter use Admixture of detergentsGeneral guidelines for the dosage of detergents Couplings MaintenanceService intervals/oil change Water filterProblem Possible cause Correction Trouble-shooting and possible correctionPortugal 7309021