3.8Operation after starting up - outlet points and equipment

3.8.1 High pressure cock with Multipressure spray lance, Outlet point A

1.Open/close handle on high-pressure cock

2.Quick-coupling

3.Trigger on spray handle

4.Safety lock

5.Quick-coupling for spray lance

6.Multipressure spray lance

Operation after starting up

1.Carefully connect the high-pressure hose to the quick-coupling of the high-pressure cock

(2). Any impurities should be removed prior to coupling.

2.Fit the spray lance (6) in the quick-coupling of the spray pistol (5).

3.Slowly turn the handle of the high-pressure cock (1) to open position and start your cleaning work.

4.After use close the high pressure cock by turning the handle (1) to closed position, relieve the hose of its pressure by opening the pistol until the hose is void of pressure.

50

Image 50
Contents Deltabooster Deltabooster How to use the Deltabooster Product Description Layout of systemPage Deltabooster switchboard Model survey and main functionsC3K pumps Line Pressure Selection of systemNumber of Pumps Selection of Spray LanceTechnical data Identification of model2 C3K pump Control systemWater tank ClassificaDimensions, weight and total performance per system No. of pumps Model 44C3Location of the Deltabooster Installation requirements for water connection Differential pressure of solenoid valve measured in barMax 125 a Installation requirements for mains power connectionDeltabooster control system Types of pipes standards Pipe systemLocation of pipelines/general instructions Rørledningskomponenter TuyauteriePipingComponents Fittings, standardsRohrleitungskomponenten-Elements Dimension Bezeichnung DesignationBezeichnung Designationdimension Rohrhalterung tuyauSupportRohrleitungskomponenten-Elements Kobber CopperDimensioning of pipe systems Page Pressure Drop ExamplesExample 50 m 40 m 70 m BarPressure Example 60 m30 m 10 m M 80 m DropBar 10 bar Example 20 m 40 m 30 m 60 m 30 m 15 m 80 mRing system Bends/hose connections Temperature compensationMounting requirements and hints CompensationFixation AT Corners and TEE Connectors Mounting of Pipe LINES/GENERAL InstructionsMounting in Connection Socket RemountingOutlet points and accessories Outlet StationAccessories Detachable foam injectorBar grey nozzle protection Multipressure spray lance systemBar black nozzle protection Location Sketch Mounting base Filter Connection of inlet waterControl of filter in water tank Page Start Starting up/runningOil control Venting of pumpsAdjustment of line pressure Venting of pipe systemDo not Interfere with this Setting How to use the DeltaboosterSafety Save these instructions for laterModel survey Functional diagram Instrument panel Main / emergency switchControl switch / starting switch and stopping switch Control panel Setting and reading of Deltabooster Setting of water temperature On 50CConnection and disconnection of C3K pumps Both should be on for the operation of a single plantReading of hour meters Starting up/running in cf. Fig Page Multipressure spray lance system Operation after starting up outlet points and equipment Operation after starting upAdmixture of detergents After useGeneral guidelines for the dosage of detergents Water filter MaintenanceService intervals/oil change CouplingsTrouble-shooting and possible correction Problem Possible cause CorrectionPortugal 7309021