Nilfisk-ALTO 7309021 user manual Mounting in Connection Socket, Remounting

Page 28

Mounting in Connection Socket

1.Saw the pipe rectangularly through and take off burrs.

2.

It will be most easy for you to saw the pipe rectangularly through by means of the pipe sawing mechanism shown. NAME:BAV 6/42

(for pipes of 6-42 mm OD).

NOTE: Do not use pipe cutter!

The pipe will be cut over slantingly and there will be burrs inside as well as outside the pipe end.

3.

Lubricate thread as well as cut- ting- and key ring with oil (not grease). Now push the pipe nut and the ring over the pipe end as shown on the drawing.

If the cutting- and key ring can- not or can only just be pushed over the end of the pipe, do not entlarge it, but file the pipe end.

6.Pipes of a large outer diameter and all connections in free pipings are mounted in a vice of practical reasons while you are fastening the connection socket. The screw spanner must have a length ap- proximately 15 times as long as the width of it. (Lengthen it by means of a pipe, if necessary). Proceed according to point 4.

When using series connection sockets, be aware that the pipe ends go into

the same inner conus as the one in which the mounting in the vice was carried out.The final tightening will be simplified by loosening the compression nut a little, so that the wearing surfaces may be supplied with a little oil.

7.

After the final feeding, loosen compression nut and check that there is an apparent belt before the cutting.If not - wring the cutting- and key ring a little extra.

Apparent belt

4.At first screw up the compression nut by hand until it has got contact with the cut- ting- and key ring. Then press the pipe wholly up to the inner conus and give the compression nut a turn of app. 3/4.

A marking thread on the compression nut will make it easier for you to observe the turns prescribed.

8.

It does not matter if the cutting- and key

 

ring can be turned on the pipe end.

9.

REMOUNTING

 

After each loosening of the connection, the

 

tightening of the compression nut may be

 

done without any lengthening with a pipe

 

and without any violent effort.

5.(NOTE: The pipe must nut turn at the same time).

The cutting- and key ring will get hold of the pipe, and now it is unnecessary to press the pipe further. For the final feed, give the compression nut another turn of approximately 3/4. By doing so, the ring will cut into the pipe and reveal an apparent belt.

10.

The straight pipe end, which goes into the screwed connection, must have a length of at least 2 lengths of the compres- sion nut (H).

If the pipings are longer or more weighted, you will have to mount a pipe fitting.

28

Image 28
Contents Deltabooster Deltabooster How to use the Deltabooster Product Description Layout of systemPage Deltabooster switchboard Model survey and main functionsC3K pumps Selection of system Number of PumpsLine Pressure Selection of Spray LanceTechnical data Identification of modelControl system Water tank2 C3K pump ClassificaDimensions, weight and total performance per system No. of pumps Model 44C3Location of the Deltabooster Installation requirements for water connection Differential pressure of solenoid valve measured in barDeltabooster control system Installation requirements for mains power connectionMax 125 a Location of pipelines/general instructions Pipe systemTypes of pipes standards Tuyauterie PipingComponentsRørledningskomponenter Fittings, standardsRohrleitungskomponenten-Elements Dimension Bezeichnung DesignationBezeichnung Designationdimension Rohrhalterung tuyauSupportRohrleitungskomponenten-Elements Kobber CopperDimensioning of pipe systems Page Examples Example 50 m 40 m 70 mPressure Drop BarExample 60 m 30 m 10 m M 80 mPressure Drop Ring system Example 20 m 40 m 30 m 60 m 30 m 15 m 80 m Bar 10 bar Temperature compensation Mounting requirements and hintsBends/hose connections CompensationFixation AT Corners and TEE Connectors Mounting of Pipe LINES/GENERAL InstructionsMounting in Connection Socket RemountingOutlet points and accessories Outlet StationAccessories Detachable foam injectorBar black nozzle protection Multipressure spray lance systemBar grey nozzle protection Location Sketch Mounting base Control of filter in water tank Connection of inlet waterFilter Page Starting up/running Oil controlStart Venting of pumpsAdjustment of line pressure Venting of pipe systemHow to use the Deltabooster SafetyDo not Interfere with this Setting Save these instructions for laterModel survey Functional diagram Control switch / starting switch and stopping switch Main / emergency switchInstrument panel Control panel Setting and reading of Deltabooster Setting of water temperature On 50CConnection and disconnection of C3K pumps Both should be on for the operation of a single plantReading of hour meters Starting up/running in cf. Fig Page Multipressure spray lance system Operation after starting up outlet points and equipment Operation after starting upAdmixture of detergents After useGeneral guidelines for the dosage of detergents Maintenance Service intervals/oil changeWater filter CouplingsTrouble-shooting and possible correction Problem Possible cause CorrectionPortugal 7309021