Nilfisk-ALTO 7309021 user manual Venting of pipe system, Adjustment of line pressure

Page 37

2.5.4 Venting of pipe system

When each pump has been vented the system is started up, and all high- pressure cocks on the pipeline are opened one at a time until all air has been removed. Begin with the remotest high pressure cock.

Please note that the cock should be closed for a short time before opening it again. The latter is done in order to prevent the leakage stop from being activated when venting long pipelines.

2.5.5 Adjustment of line pressure

Adjustment of line pressure should only be carried out by an

authorized Nilfisk-ALTO service technician.

As a standard the DELTABOOSTER is adjusted to a line pressure of 160 bar, but it may be adjusted to any line pressure within the area 90 to 160 bar.

It will always be expedient to choose a line pressure corresponding to the highest working pres- sure / nozzle pressure which you know will be required for your cleaning jobs.

A Nilfisk-ALTO service technician can adjust the high pressure switch (1) and the overflow valve

(2)to the required line pressure. The pressure can be read from the pressure gauge (3).

Fig. 8

3

2

1

37

Image 37
Contents Deltabooster Deltabooster How to use the Deltabooster Layout of system Product DescriptionPage Model survey and main functions Deltabooster switchboardC3K pumps Number of Pumps Selection of systemLine Pressure Selection of Spray LanceIdentification of model Technical dataWater tank Control system2 C3K pump ClassificaNo. of pumps Model 44C3 Dimensions, weight and total performance per systemLocation of the Deltabooster Differential pressure of solenoid valve measured in bar Installation requirements for water connectionDeltabooster control system Installation requirements for mains power connectionMax 125 a Location of pipelines/general instructions Pipe systemTypes of pipes standards PipingComponents TuyauterieRørledningskomponenter Fittings, standardsRohrleitungskomponenten-Elements Bezeichnung Designation DimensionRohrhalterung tuyauSupport Bezeichnung DesignationdimensionKobber Copper Rohrleitungskomponenten-ElementsDimensioning of pipe systems Page Example 50 m 40 m 70 m ExamplesPressure Drop Bar30 m 10 m M 80 m Example 60 mPressure DropRing system Example 20 m 40 m 30 m 60 m 30 m 15 m 80 mBar 10 bar Mounting requirements and hints Temperature compensationBends/hose connections CompensationMounting of Pipe LINES/GENERAL Instructions Fixation AT Corners and TEE ConnectorsRemounting Mounting in Connection SocketOutlet Station Outlet points and accessoriesDetachable foam injector AccessoriesBar black nozzle protection Multipressure spray lance systemBar grey nozzle protection Location Sketch Mounting base Control of filter in water tank Connection of inlet waterFilter Page Oil control Starting up/runningStart Venting of pumpsVenting of pipe system Adjustment of line pressureSafety How to use the DeltaboosterDo not Interfere with this Setting Save these instructions for laterModel survey Functional diagram Control switch / starting switch and stopping switch Main / emergency switchInstrument panel Control panel Setting and reading of Deltabooster On 50C Setting of water temperatureBoth should be on for the operation of a single plant Connection and disconnection of C3K pumpsReading of hour meters Starting up/running in cf. Fig Page Multipressure spray lance system Operation after starting up Operation after starting up outlet points and equipmentAfter use Admixture of detergentsGeneral guidelines for the dosage of detergents Service intervals/oil change MaintenanceWater filter CouplingsProblem Possible cause Correction Trouble-shooting and possible correctionPortugal 7309021