Nilfisk-ALTO 7309021 user manual Example 60 m, 30 m 10 m M 80 m, Pressure, Drop

Page 24

B:

If, on the other hand, a green spray lance is selected = 33 l/min + a standard spray lance = 17 l/min the maximum load on the line b-c= 33 l/min.

Use of 50 m 15 mm pipe will result in a pressure drop of:

Maximum load on line a-b= 50 l/min.

Use of 40 m 22 mm pipe will result in a pressure drop of:

Maximum load on line M-a= 50 l/min.

Use of 70 m 22 mm pipe will result in a pressure drop of:

Total pressure drop

PRESSURE DROP

9.3bar

2.0bar

3.2bar

14.5bar

The aggregate pressure drop on the three lines is less than 15 bar and the dimension require- ments have therefore been met.

Example 2

60 m

20

c

10m 20

c1

b1

 

a1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

20

 

 

 

 

 

20

 

 

 

 

 

 

 

 

 

 

b

 

 

 

 

 

a

 

 

 

 

 

 

 

 

 

 

30 m

 

 

 

 

30 m

 

10 m M

20

 

 

 

 

 

20

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

2

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

c

b

a

80 m

Branched system

Selection of spray lance: 2 green spray lances each of 33 l/min 2 blue spray lances each of 17 l/min

 

PRESSURE

Maximum load in each branch is 33 l/min

DROP

Use of15 mm pipe on e.g. the a-a2line

 

 

(20m) will result in a pressure drop of:

4.0

bar

Maximum load on line b-c= 66 l/min

 

 

Use of 30 m 22 mm pipe will result in a pressure drop of:

2.5

bar

Maximum load on line a-b + M-a= 101 l/min

 

 

Use of 40 m 22 mm pipe will result in a pressure drop of:

7.5

bar

Total pressure drop

14.0

bar

 

 

 

The aggregate pressure drop on the three lines is less than 15 bar and the dimension require- ments have therefore been met.

24

Image 24
Contents Deltabooster Deltabooster How to use the Deltabooster Product Description Layout of systemPage Deltabooster switchboard Model survey and main functionsC3K pumps Selection of system Number of PumpsLine Pressure Selection of Spray LanceTechnical data Identification of modelControl system Water tank2 C3K pump ClassificaDimensions, weight and total performance per system No. of pumps Model 44C3Location of the Deltabooster Installation requirements for water connection Differential pressure of solenoid valve measured in barInstallation requirements for mains power connection Deltabooster control systemMax 125 a Pipe system Location of pipelines/general instructionsTypes of pipes standards Tuyauterie PipingComponentsRørledningskomponenter Fittings, standardsRohrleitungskomponenten-Elements Dimension Bezeichnung DesignationBezeichnung Designationdimension Rohrhalterung tuyauSupportRohrleitungskomponenten-Elements Kobber CopperDimensioning of pipe systems Page Examples Example 50 m 40 m 70 mPressure Drop BarExample 60 m 30 m 10 m M 80 mPressure DropExample 20 m 40 m 30 m 60 m 30 m 15 m 80 m Ring systemBar 10 bar Temperature compensation Mounting requirements and hintsBends/hose connections CompensationFixation AT Corners and TEE Connectors Mounting of Pipe LINES/GENERAL InstructionsMounting in Connection Socket RemountingOutlet points and accessories Outlet StationAccessories Detachable foam injectorMultipressure spray lance system Bar black nozzle protectionBar grey nozzle protection Location Sketch Mounting base Connection of inlet water Control of filter in water tankFilter Page Starting up/running Oil controlStart Venting of pumpsAdjustment of line pressure Venting of pipe systemHow to use the Deltabooster SafetyDo not Interfere with this Setting Save these instructions for laterModel survey Functional diagram Main / emergency switch Control switch / starting switch and stopping switchInstrument panel Control panel Setting and reading of Deltabooster Setting of water temperature On 50CConnection and disconnection of C3K pumps Both should be on for the operation of a single plantReading of hour meters Starting up/running in cf. Fig Page Multipressure spray lance system Operation after starting up outlet points and equipment Operation after starting upAdmixture of detergents After useGeneral guidelines for the dosage of detergents Maintenance Service intervals/oil changeWater filter CouplingsTrouble-shooting and possible correction Problem Possible cause CorrectionPortugal 7309021