Nilfisk-ALTO 7309021 user manual Fixation AT Corners and TEE Connectors

Page 27

FIXATION AT CORNERS AND TEE CONNECTORS

Standard distance between pipe brackets is some 2 m.

MOUNTING OF PIPE LINES/GENERAL INSTRUCTIONS

-Shorten the pipes by sawing off and take off burrs.

-When bending the pipe bending radii should not be smaller than those stated in the chart under “U-bends/hose connections” and the bending should always be completed in a bend- ing tool with rolling matrixes in order to prevent deformation of the pipe.

-Union nut and cutting ring should be greased with oil and the cutting ring should be pre-fitted to the pipe in the screw joint or the annealed pre-mounting socket before fitting the pipe.

-Place the pipe brackets at a maximum interval of 2 m.

-Use 6 hexagon-headed screw with expansion joint for wall or concrete walls when mounting wall fittings, alternatively use a knock-type anchor for concrete walls, e.g. HILTI type HPS 8/30.

-In systems meant for hot water, care should be taken to place the pipe brackets on a straight line in order to prevent the lengthwise expansion of the pipe.

27

Image 27
Contents Deltabooster Deltabooster How to use the Deltabooster Layout of system Product DescriptionPage Model survey and main functions Deltabooster switchboardC3K pumps Selection of Spray Lance Selection of systemNumber of Pumps Line PressureIdentification of model Technical dataClassifica Control systemWater tank 2 C3K pumpNo. of pumps Model 44C3 Dimensions, weight and total performance per systemLocation of the Deltabooster Differential pressure of solenoid valve measured in bar Installation requirements for water connectionInstallation requirements for mains power connection Deltabooster control systemMax 125 a Pipe system Location of pipelines/general instructionsTypes of pipes standards Fittings, standards TuyauteriePipingComponents RørledningskomponenterRohrleitungskomponenten-Elements Bezeichnung Designation DimensionRohrhalterung tuyauSupport Bezeichnung DesignationdimensionKobber Copper Rohrleitungskomponenten-ElementsDimensioning of pipe systems Page Bar ExamplesExample 50 m 40 m 70 m Pressure DropDrop Example 60 m30 m 10 m M 80 m PressureExample 20 m 40 m 30 m 60 m 30 m 15 m 80 m Ring systemBar 10 bar Compensation Temperature compensationMounting requirements and hints Bends/hose connectionsMounting of Pipe LINES/GENERAL Instructions Fixation AT Corners and TEE ConnectorsRemounting Mounting in Connection SocketOutlet Station Outlet points and accessoriesDetachable foam injector AccessoriesMultipressure spray lance system Bar black nozzle protectionBar grey nozzle protection Location Sketch Mounting base Connection of inlet water Control of filter in water tankFilter Page Venting of pumps Starting up/runningOil control StartVenting of pipe system Adjustment of line pressureSave these instructions for later How to use the DeltaboosterSafety Do not Interfere with this SettingModel survey Functional diagram Main / emergency switch Control switch / starting switch and stopping switchInstrument panel Control panel Setting and reading of Deltabooster On 50C Setting of water temperatureBoth should be on for the operation of a single plant Connection and disconnection of C3K pumpsReading of hour meters Starting up/running in cf. Fig Page Multipressure spray lance system Operation after starting up Operation after starting up outlet points and equipmentAfter use Admixture of detergentsGeneral guidelines for the dosage of detergents Couplings MaintenanceService intervals/oil change Water filterProblem Possible cause Correction Trouble-shooting and possible correctionPortugal 7309021