3.6Starting up/running in (cf. Fig. 4)

Once the desired settings have been made the cover of the switchboard should be closed and both locks activated.

Make sure the water supply has been connected.

Turn the main switch (1) to position I.

Turn the control switch (2), to position I and keep an eye on the control panel (3) to make sure that water is drawn in and the relief valve closed.

(Are there any red indicator lamps flashing on the control panel? cf. sect. "3.10 Trouble-shoot- ing and corrections")

Press the starting switch (4) and 1 pump will then start running if the line pressure is on working pressure or even higher. If the pressure is lower, 2 pumps will start and an additional pump will start every other second until a working pressure has been achieved.

Fig. 4

3

2

4

1

The system is now in operation and water may be drawn off under high pressure at the individual outlets. If consumption exceeds the capacity of the pumps connected a pump will immediately be started up and an additional pump will follow every other second until capacity meets con- sumption.

If consumption drops at the outlets so that the pump capacity becomes excessive, one pump will stop every 15 seconds, until capacity meets consumption.

The controls determine a rotation between the individual C3K pumps so that all units -time-wise- are subjected to the same load.

If consumption at the outlets is cut off completely all pumps will stop 1 every 15 seconds. The system will then be on STAND BY with a working pressure on the line and one or more pumps will start operating again as soon as the pressure in the line drops below 25 bar or if the outlets are re-activated.

47

Image 47
Contents Deltabooster Deltabooster How to use the Deltabooster Layout of system Product DescriptionPage Model survey and main functions Deltabooster switchboardC3K pumps Selection of Spray Lance Selection of systemNumber of Pumps Line PressureIdentification of model Technical dataClassifica Control systemWater tank 2 C3K pumpNo. of pumps Model 44C3 Dimensions, weight and total performance per systemLocation of the Deltabooster Differential pressure of solenoid valve measured in bar Installation requirements for water connectionMax 125 a Installation requirements for mains power connectionDeltabooster control system Types of pipes standards Pipe systemLocation of pipelines/general instructions Fittings, standards TuyauteriePipingComponents RørledningskomponenterRohrleitungskomponenten-Elements Bezeichnung Designation DimensionRohrhalterung tuyauSupport Bezeichnung DesignationdimensionKobber Copper Rohrleitungskomponenten-ElementsDimensioning of pipe systems Page Bar ExamplesExample 50 m 40 m 70 m Pressure DropDrop Example 60 m30 m 10 m M 80 m PressureBar 10 bar Example 20 m 40 m 30 m 60 m 30 m 15 m 80 mRing system Compensation Temperature compensationMounting requirements and hints Bends/hose connectionsMounting of Pipe LINES/GENERAL Instructions Fixation AT Corners and TEE ConnectorsRemounting Mounting in Connection SocketOutlet Station Outlet points and accessoriesDetachable foam injector AccessoriesBar grey nozzle protection Multipressure spray lance systemBar black nozzle protection Location Sketch Mounting base Filter Connection of inlet waterControl of filter in water tank Page Venting of pumps Starting up/runningOil control StartVenting of pipe system Adjustment of line pressureSave these instructions for later How to use the DeltaboosterSafety Do not Interfere with this SettingModel survey Functional diagram Instrument panel Main / emergency switchControl switch / starting switch and stopping switch Control panel Setting and reading of Deltabooster On 50C Setting of water temperatureBoth should be on for the operation of a single plant Connection and disconnection of C3K pumpsReading of hour meters Starting up/running in cf. Fig Page Multipressure spray lance system Operation after starting up Operation after starting up outlet points and equipmentAfter use Admixture of detergentsGeneral guidelines for the dosage of detergents Couplings MaintenanceService intervals/oil change Water filterProblem Possible cause Correction Trouble-shooting and possible correctionPortugal 7309021