1.7.5 Examples

The following examples have been worked out on the basis of stainless steel pipes and a 160 bar system, and the dimension requirements are max.15 bar pressure drop from the machine to the outlet points.

Example 1

 

 

50 m

40 m

70 m

 

 

M

c

b

a

Two different conditions may be used when dimensioning the pipe system:

A. Based upon a fixed type of spray lance (capacity l/min)

B. Based upon max. capacity, i.e. all spray lances may be used anywhere

A:

If standard lances (17 l/min) are selected for outlet points a, b and c the maximum load on line b-c= 17 l/min.

According to the diagram the use of a 50 m 15 mm pipe will result in a pressure drop of:

In the diagram you follow the 50 m division vertically upwards to the curve symbolizing 17 l/min through an 15 mm pipe. From here proceed horizontally and a pressure drop of 2.3 bar is had.

Maximum load on pipe line a-b = 35 l/min.

Use of 40 m Ø15 mm pipe will result in a pressure drop of:

Maximum load on pipe line M-a = 51 l/min.

Use of 70 m Ø22 mm pipe will result in a pressure drop of: Total pressure drop

PRESSURE DROP

2.3bar

7.4bar

3.3bar

13.0bar

The aggregate pressure drop on the three lines is less than 15 bar and the dimension requirements have therefore been met.

23

Image 23
Contents Deltabooster Deltabooster How to use the Deltabooster Layout of system Product DescriptionPage Model survey and main functions Deltabooster switchboardC3K pumps Selection of Spray Lance Selection of systemNumber of Pumps Line PressureIdentification of model Technical dataClassifica Control systemWater tank 2 C3K pumpNo. of pumps Model 44C3 Dimensions, weight and total performance per systemLocation of the Deltabooster Differential pressure of solenoid valve measured in bar Installation requirements for water connectionMax 125 a Installation requirements for mains power connectionDeltabooster control system Types of pipes standards Pipe systemLocation of pipelines/general instructions Fittings, standards TuyauteriePipingComponents RørledningskomponenterRohrleitungskomponenten-Elements Bezeichnung Designation DimensionRohrhalterung tuyauSupport Bezeichnung DesignationdimensionKobber Copper Rohrleitungskomponenten-ElementsDimensioning of pipe systems Page Bar ExamplesExample 50 m 40 m 70 m Pressure DropDrop Example 60 m30 m 10 m M 80 m PressureBar 10 bar Example 20 m 40 m 30 m 60 m 30 m 15 m 80 mRing system Compensation Temperature compensationMounting requirements and hints Bends/hose connectionsMounting of Pipe LINES/GENERAL Instructions Fixation AT Corners and TEE ConnectorsRemounting Mounting in Connection SocketOutlet Station Outlet points and accessoriesDetachable foam injector AccessoriesBar grey nozzle protection Multipressure spray lance systemBar black nozzle protection Location Sketch Mounting base Filter Connection of inlet waterControl of filter in water tank Page Venting of pumps Starting up/runningOil control StartVenting of pipe system Adjustment of line pressureSave these instructions for later How to use the DeltaboosterSafety Do not Interfere with this SettingModel survey Functional diagram Instrument panel Main / emergency switchControl switch / starting switch and stopping switch Control panel Setting and reading of Deltabooster On 50C Setting of water temperatureBoth should be on for the operation of a single plant Connection and disconnection of C3K pumpsReading of hour meters Starting up/running in cf. Fig Page Multipressure spray lance system Operation after starting up Operation after starting up outlet points and equipmentAfter use Admixture of detergentsGeneral guidelines for the dosage of detergents Couplings MaintenanceService intervals/oil change Water filterProblem Possible cause Correction Trouble-shooting and possible correctionPortugal 7309021