Bryant manual Catalog No. PDS580J

Page 86

580J

b.Minimum of four connection locations per unit.

13.Propeller Power Exhaust:

a.Power exhaust shall be used in conjunction with an integrated economizer.

b.Independent modules for vertical or horizontal return configurations shall be available.

c.Horizontal power exhaust is shall be mounted in return ductwork.

d.Power exhaust shall be controlled by economizer controller operation. Exhaust fans shall be energized when dampers open past the 0-100% adjustable setpoint on the economizer control.

14.Roof Curbs (Vertical):

a.Full perimeter roof curb with exhaust capability providing separate air streams for energy recovery from the exhaust air without supply air contamination.

b.Formed galvanized steel with wood nailer strip and shall be capable of supporting entire unit weight.

c.Permits installation and securing of ductwork to curb prior to mounting unit on the curb.

15.High Altitude Gas Conversion Kit:

a.Package shall contain all the necessary hardware and instructions to convert a standard natural gas unit to op- erate from 2000-7000 ft (610 to 2134m) elevation with natural gas or from 0-7000 ft (90-2134m) elevation with liquefied propane.

16.Outdoor Air Enthalpy Sensor:

a.The outdoor air enthalpy sensor shall be used to provide single enthalpy control. When used in conjunction with a return air enthalpy sensor, the unit will provide differential enthalpy control. The sensor allows the unit to determine if outside air is suitable for free cooling.

17.Return Air Enthalpy Sensor:

a.The return air enthalpy sensor shall be used in conjunction with an outdoor air enthalpy sensor to provide dif- ferential enthalpy control.

18.Indoor Air Quality (CO2) Sensor:

a.Shall be able to provide demand ventilation indoor air quality (IAQ) control.

b.The IAQ sensor shall be available in duct mount, wall mount, or wall mount with LED display. The setpoint shall have adjustment capability.

19.Smoke detectors (factory installed only):

a.Shall be a Four-Wire Controller and Detector.

b.Shall be environmental compensated with differential sensing for reliable, stable, and drift-free sensitivity.

c.Shall use magnet-activated test/reset sensor switches.

d.Shall have tool-less connection terminal access.

e.Shall have a recessed momentary switch for testing and resetting the detector.

f.Controller shall include:

(1.) One set of normally open alarm initiation contacts for connection to an initiating device circuit on a fire alarm control panel.

(2.) Two Form-C auxiliary alarm relays for interface with rooftop unit or other equipment.

(3.) One Form-C supervision (trouble) relay to control the operation of the Trouble LED on a remote test/reset station.

(4.) Capable of direct connection to two individual detector modules.

(5.) Can be wired to up to 14 other duct smoke detectors for multiple fan shutdown applications

20.Winter start kit

a.Shall contain a bypass device around the low pressure switch.

b.Shall be required when mechanical cooling is required down to 25_F (-4_C).

c.Shall not be required to operate on an economizer when below an outdoor ambient of 40_F (4_C).

21.Time Guard

a.Shall prevent compressor short-cycling by providing a 5-minute delay (±2 minutes) before restarting a com- pressor after shutdown for any reason.

b.One device shall be required per compressor.

E2010 Bryant Heating & Cooling Systems D 7310 W. Morris St. D Indianapolis, IN 46231

Printed in U.S.A.

Edition Date: 04/10

Catalog No. PDS580J---

08

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Replaces: PDS580J---

07

86

Image 86
Contents Product Data Table of Contents Certified to ISOFeatures and Benefits Intake/Exhaust Options Voltage Factory Installed OptionsUnit Type Packaging Cooling TonsEconomizers FACTORY-INSTALLED Options and FIELD-INSTALLED AccessoriesCondenser Protection Economizer SensorsFactory Options AND/OR Accessories Economizer dry-bulb or enthalpyFactory Options AND/OR Accessories Motormaster Head Pressure ControllerUnit Ahri Cooling Rating TableNOM NET Cooling Seer EER Ieer StagesUnits Heating Rating Table Natural GAS & PropaneAL/SS Heat Exchanger Temp Rise Thermal Afue EfficiencySound Performance Table Stages WeightedHeating Rating Table LOW NOx1 Unit CoolingMinimum Maximum Minimum Maximum Airflow Ratings Natural GAS & PropaneCooling Heating Minimum Physical Data TonsNatural Gas, Propane Heat Heat Anticipator Setting Amps580J*04 580J*05 580J*06 580J*07 Gas Connection Low NOx Gas Heat8.5 Tons 10 12.5 Tons Refrigeration System 580J*12A 580J*12D 580J*14D12.5 Tons 580J*08 580J*09 580J*12 580J*14 Gas ConnectionCurbs & Weights Dimensions 580J*04-07 Dimensions 580JCurbs & Weights Dimensions 580J*04-07 Dimension ConditionRoof Curb Details Curbs & Weights Dimensions 580J*08-12 Curbs & Weights Dimensions 580J*08-12 580JCurbs & Weights Dimensions 580J*08-14 Curbs & Weights Dimensions 580J Dimensions 580J-14Curbs & Weights Dimensions 580J 14 Options & Accessory Weights Option / Accessory WeightsApplication Data Min operating ambient temp coolingApplication Data Sizing a rooftopSelection Procedure with 580J*07A EXAMPLE1 Rtpf Ambient TemperatureCooling Capacities SHCEdb 900 1200 15001050 1200 1350 Ewb580J*05A 105 115 1200 1600 2000 580J*06A 105 115 1750 2000 2250 1800 580J*07A 105 115EAT db 21002100 2400 2700 2100 2400 2700 1750 2000580J*08A 105 115 580J*08D 105 115 Rtpf & Novation EA db2250/0.05 3000/0.07 3750/0.09 Condenser Edb Cooling Capacities 2-STAGE Cooling Rtpf only TonsTemp F AIR ENT 2250 3000 3750580J*09A 105 115 580J*09D 105 115 2550/0.04 3400/0.05 4250/0.07 Condenser Edb 2550 3400 4250580J*12A 105 115 580J*12D 105 115 Rtpf & Novation 3000 4000 5000 Cooling Capacities 2-STAGE Cooling Rtpf only3000/0.04 4000/0.06 5000/0.07 Condenser Edb 580J*14D 105 115 Rtpf & Novation CONDENSEREdb 3750/0.02 5000/0.06 6250/0.05 Condenser EdbTemp Fair ENT 3750 5000 6250Tons Static Pressure Adders Factory Options and/or Accessories12.5 Tons CFM RPM BHP FAN Performance580J*04 FAN Performance Medium Static Option High Static Option1201 580J*051177 1213 1268 13211486 14931506 1482 580J*06Medium Static Option Field---Supplied Drive1 1696 1752 17191713 1736580J*07 580J*08 580J*09 580J*12 579580J*14 Pulley Adjustment Unit MOTOR/DRIVE Motor Pulley Turns Open ComboECONOMIZER, Barometric Relief and PE Performance 2000 1000580J*05A Stage Cooling Electrical Information580J*04A Stage Cooling 580J*06A Stage Cooling580J*08A Stage Cooling Tons Electrical Information580J*07A Stage Cooling 580J*08D Stage Cooling Tons580J*12A Stage Cooling 580J*09A Stage Cooling Tons580J*09D Stage Cooling Tons RLA LRA 580J*12D Stage Cooling580J*14D Stage Cooling Tons MCA/MOCP Determination no C.O. or Unpwrd C.O Unit Combustion Power NOM IFM FAN Motor Exhaust No P.EUnbalanced 3-Phase Supply Voltage MCA Mocp MCA/MOCP Determination W/ Pwrd C.OPwrd C.O Mocp FLA LRACont. MCA/MOCP Determination W/ Pwrd C.O Typical Wiring Diagrams Stage Cooling Typical Power DiagramTypical Wiring Diagrams Stage Typical Wiring Diagram C08578 Heating Sequence of OperationCooling Sequence of Operation Optional Perfect Humidity Dehumidification SystemSubcooling Mode Reheat 1 Perfect Humidity System 580J04-14 23 07 16 Hvac Equipment Insulation Guide Specifications 580J*04-14Gas Heat/Electric Cooling Packaged Rooftop 23 09 13 Instrumentation and Control Devices for Hvac23 40 13 Panel Air Filters 23 09 33 Electric and Electronic Control System for Hvac23 09 93 Sequence of Operations for Hvac Controls 23 81 19 Self-Contained Air Conditioners580J 580J 580J 580J 580J 580J Catalog No. PDS580J
Related manuals
Manual 94 pages 40.55 Kb