Hearth and Home Technologies RCOR-HVB-CE, PIER-HVB-CE, LCOR-HVB-CE Rcor-Hvb-Ce Í, Valve Assembly

Page 12

Service Parts

PIER-HVB-CE, ST-HVB-CE

L&RCOR-HVB-CE Í

 

 

 

Valve Assembly

Beginning Manufacturing Date: 6-04

 

Ending Manufacturing Date: ______

Standing Pilot Valve Assembly

8

9

4 5

13

12

6

 

11

 

10

1

8

 

2

3

ITEM

DESCRIPTION

SERIAL #

PART NUMBER

1

Shut Off Valve Assembly

 

302-330A

2

ON/OFF Wire Assembly

 

060-521A

3

SIT Valve NG

 

060-524

3

SIT Valve NG

 

060-526

4

Elbow Flex Assembly

 

530-302A

5

Burner Neck Gasket

 

438-407

6

Valve Plate Gasket

 

2005-140

7

Piezo Ignitor

 

219-513

8

Pilot Assembly NG

 

529-540A

8

Pilot Assembly LP

 

529-541A

9

Pilot Bracket

 

2068-114

10

Valve Bracket

 

2068-115

11

Offset Bracket

 

2068-111

11

Burner Leg

 

2068-113

12

Pilot Support

 

2068-112

 

20" Wire Harness

 

107-559A

 

 

 

 

12

Heat & Glo • PIER/ST/L&RCOR-HVB-CE2068-900 Rev. H • 6/07

Image 12
Contents 0087 Safety and Warning Information Table of Contents PIER-HVB-CE NG, LP Exploded Parts Diagram PIER-HVB-CEST-HVB-CE ST-HVB-CE LCOR-HVB-CE LCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE Valve Assembly RCOR-HVB-CE ÍInstallation Regulations Pre-install PreparationAppliance Certification CertificationDiagram of the PIER-HVB-CE Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07Diagram of the ST-HVB-CE Diagram of the LCOR-HVB-CE and RCOR-HVB-CE Fireplace Dimensions and Locations Locating the FireplaceFraming the Fireplace Clearance RequirementsModel AT Each Joint Installing the Flue System Flue System ApprovalsIdentifying Flue Components Terminations KitsStraight OUT Horizontalflueing Max. RunFlueing with One 90 Elbow Flueing with Two 90 Elbows Propane / Butane Flueing with TWO 90 Elbows Flueing with three 90 elbows + H1 FT + V1 FT Installing Flue Components Attach the First Flue Component to the Starting CollarsInstall Support Brackets Continue Adding Flue ComponentsCombustibles inside the framed firestop opening Ceiling Firestop Ceiling Side Trapezoid Termination CapMinimum Height from Roof to Lowest Discharge Opening Vent Termination Minimum Clearances Positioning, Leveling, and Securing the Fireplace Gas Control SystemSecuring of a Fireplace Gas Supply Line Gas Pressure RequirementsNatural Gas Wiring the Fireplace Optional AccessoriesWall Switch FinishingInstalling Trim, Logs & Ember Material Log placementInstalling the Trim Attachment of Lower Door AssemblyHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 3 4 Only for Model LCOR-HVB-CEHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 After the Installation Double-check for faulty componentsBefore Lighting the Fireplace Lighting the FireplaceFireplace Maintenance Cleaning Glass DoorReplacing old ember material Checking Flame Patterns, Flame Height5Troubleshooting Troubleshooting Be Placed in this Opening