Hearth and Home Technologies RCOR-HVB-CE manual Positioning, Leveling, and Securing the Fireplace

Page 32

Step 4. Positioning, Leveling, and Securing the Fireplace

The diagram below shows how to properly position, level, and secure the fireplace.

NAILING

TABS

(BOTH

SIDES)

Figure 27. Proper Positioning, Leveling, and

Securing of a Fireplace

Place the fireplace into position.

Level the fireplace from side to side and from front to back.

Shim the fireplace with non-combustible material, such as sheet metal, as necessary.

Secure the fireplace to the framing by nailing or screwing.

Holes are provided in the base pan for securing the unit to the floor.

Step 5. The Gas Control System

!WARNING: THIS UNIT IS NOT FOR USE WITH SOLID FUEL.

Standing

Pilot

Flame Sensor Rod

Figure 28. Gas Control System

Standing Pilot Ignition System

This system includes millivolt control valve, Standing Pilot, thermopile/thermocouple flame sensor, and piezo ignitor.

!WARNING: 230 VAC MUST NEVER BE CONNECTED TO A CONTROL VALVE IN A

MILLIVOLT SYSTEM.

32

Heat & Glo • PIER/ST/L&RCOR-HVB-CE2068-900 Rev. H • 6/07

Image 32
Contents 0087 Safety and Warning Information Table of Contents PIER-HVB-CE NG, LP Exploded Parts Diagram PIER-HVB-CEST-HVB-CE ST-HVB-CE LCOR-HVB-CE LCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE Valve Assembly RCOR-HVB-CE ÍInstallation Regulations Pre-install PreparationAppliance Certification CertificationDiagram of the PIER-HVB-CE Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07Diagram of the ST-HVB-CE Diagram of the LCOR-HVB-CE and RCOR-HVB-CE Fireplace Dimensions and Locations Locating the FireplaceFraming the Fireplace Clearance RequirementsModel AT Each Joint Installing the Flue System Flue System ApprovalsIdentifying Flue Components Terminations KitsStraight OUT Horizontalflueing Max. RunFlueing with One 90 Elbow Flueing with Two 90 Elbows Propane / Butane Flueing with TWO 90 Elbows Flueing with three 90 elbows + H1 FT + V1 FT Installing Flue Components Attach the First Flue Component to the Starting CollarsCombustibles inside the framed firestop opening Install Support BracketsContinue Adding Flue Components Ceiling Firestop Ceiling Side Trapezoid Termination CapMinimum Height from Roof to Lowest Discharge Opening Vent Termination Minimum Clearances Securing of a Fireplace Positioning, Leveling, and Securing the FireplaceGas Control System Natural Gas Gas Supply LineGas Pressure Requirements Wiring the Fireplace Optional AccessoriesWall Switch FinishingInstalling Trim, Logs & Ember Material Log placementInstalling the Trim Attachment of Lower Door AssemblyHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 3 4 Only for Model LCOR-HVB-CEHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 After the Installation Double-check for faulty componentsBefore Lighting the Fireplace Lighting the FireplaceFireplace Maintenance Cleaning Glass DoorReplacing old ember material Checking Flame Patterns, Flame Height5Troubleshooting Troubleshooting Be Placed in this Opening