Hearth and Home Technologies PIER-HVB-CE, ST-HVB-CE Diagram of the LCOR-HVB-CE and RCOR-HVB-CE

Page 16

 

 

5-14

 

 

 

 

 

(133mm)

 

1/2

 

 

 

 

 

 

 

 

 

 

(13mm)

 

 

 

Ø8

 

(4)

 

 

 

 

 

 

 

 

(204mm)

 

 

 

 

 

12

 

 

 

 

 

(306mm)

 

 

 

 

 

12

42-5/8

 

17-3/4

Ø8

(305mm)

 

(204mm)

 

 

(1082mm)

 

(451mm)

 

 

 

 

 

 

 

ELECTRICAL

 

 

 

 

 

ACCESS

 

 

 

 

 

GAS LINE

 

42

 

 

 

 

(1067mm)

 

 

 

ACCESS

 

 

 

 

 

 

 

34-3/4

 

2-9/16

 

17-15/16

17-15/16

 

 

(456mm)

(456mm)

(882mm)

 

(64mm)

 

 

 

10

 

 

32-1/8

9-11/16

9-11/16

(254mm)

 

 

(816mm)

(245mm)

(245mm)

 

2-5/16

24-1/8

7-1/4

 

37-7/16

 

(612mm)

(184mm)

 

(58mm)

 

 

 

 

 

(950mm)

 

29-1/4

4-3/4

 

 

 

 

 

 

 

 

(743mm)

(121mm)

 

 

 

 

TOP FLUE

 

TOP STANDOFFS

 

 

 

COLLARS

 

 

 

 

 

 

 

 

 

 

REAR FLUE

 

 

 

 

 

COLLARS

 

 

 

 

 

GAS LINE

 

GAS CONTROLS

 

 

 

ACCESS

 

 

 

 

ELECTRICAL

 

& LABELS

 

 

 

ACCESS

Figure 3. Diagram of the LCOR-HVB-CE and RCOR-HVB-CE

 

 

16

 

Heat & Glo • PIER/ST/L&RCOR-HVB-CE2068-900 Rev. H • 6/07

 

Image 16
Contents 0087 Safety and Warning Information Table of Contents PIER-HVB-CE NG, LP Exploded Parts Diagram PIER-HVB-CEST-HVB-CE ST-HVB-CE LCOR-HVB-CE LCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE Valve Assembly RCOR-HVB-CE ÍInstallation Regulations Pre-install PreparationAppliance Certification CertificationDiagram of the PIER-HVB-CE Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07Diagram of the ST-HVB-CE Diagram of the LCOR-HVB-CE and RCOR-HVB-CE Fireplace Dimensions and Locations Locating the FireplaceFraming the Fireplace Clearance RequirementsModel AT Each Joint Installing the Flue System Flue System ApprovalsIdentifying Flue Components Terminations KitsStraight OUT Horizontalflueing Max. RunFlueing with One 90 Elbow Flueing with Two 90 Elbows Propane / Butane Flueing with TWO 90 Elbows Flueing with three 90 elbows + H1 FT + V1 FT Installing Flue Components Attach the First Flue Component to the Starting CollarsContinue Adding Flue Components Install Support BracketsCombustibles inside the framed firestop opening Ceiling Firestop Ceiling Side Trapezoid Termination CapMinimum Height from Roof to Lowest Discharge Opening Vent Termination Minimum Clearances Gas Control System Positioning, Leveling, and Securing the FireplaceSecuring of a Fireplace Gas Pressure Requirements Gas Supply LineNatural Gas Wiring the Fireplace Optional AccessoriesWall Switch FinishingInstalling Trim, Logs & Ember Material Log placementInstalling the Trim Attachment of Lower Door AssemblyHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 3 4 Only for Model LCOR-HVB-CEHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 After the Installation Double-check for faulty componentsBefore Lighting the Fireplace Lighting the FireplaceFireplace Maintenance Cleaning Glass DoorReplacing old ember material Checking Flame Patterns, Flame Height5Troubleshooting Troubleshooting Be Placed in this Opening