Hearth and Home Technologies PIER-HVB-CE, RCOR-HVB-CE, LCOR-HVB-CE Flueing with three 90 elbows

Page 25

 

 

NATURAL GAS

 

 

PROPANE / BUTANE

 

 

 

FLUEING WITH THREE 90° ELBOWS

 

FLUEING WITH THREE 90° ELBOWS

 

 

V + V1 (FT.)

H + H1 (FT.)

 

V + V1 (FT.)

H + H1 (FT.)

 

 

1' MIN. (305mm)

3' MAX. (914mm)

1' MIN. (305mm)

2' MAX. (610mm)

 

 

2' MIN. (610mm)

6' MAX.

(1.83m)

 

2' MIN. (610mm)

4' MAX.

(1.22m)

 

 

3' MIN. (914mm)

9' MAX.

(2.7m)

 

3' MIN. (914mm)

6’ MAX. (1.83m)

 

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

 

4' MIN. (1.22m)

8' MAX.

(2.4m)

 

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

 

5’ MIN. (1.5m)

10' MAX.

(3.0m)

 

 

V+ V1 + H + H1 = 36’ MAX. (10.9m)

 

V+ V1 + H + H1 = 36’ MAX. (10.9m)

 

 

H + H1 = 15’ MAX. (4.5m)

 

H + H1 = 10’ MAX. (3.0m)

V1

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

H1

 

 

 

 

 

 

 

 

 

 

H

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

H2

 

 

 

 

 

 

 

 

 

 

 

H1

 

 

 

 

 

 

 

 

 

 

H

 

 

NATURAL GAS

 

PROPANE / BUTANE

 

 

 

FLUEING WITH THREE 90° ELBOWS

FLUEING WITH THREE 90° ELBOWS

 

 

V + V1 (FT.)

H + H1 + H2 (FT.)

V + V1 (FT.)

 

H + H1 + H2 (FT.)

 

 

1' MIN. (305mm)

3' MAX. (914mm)

1' MIN. (305mm)

 

2' MAX. (610mm)

 

 

2' MIN. (610mm)

6' MAX.

(1.83m)

2' MIN. (610mm)

 

4' MAX.

(1.22m)

 

 

3' MIN. (914mm)

9' MAX.

(2.7m)

3' MIN. (914mm)

 

6’ MAX. (1.83m)

 

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

4' MIN. (1.22m)

 

8' MAX.

(2.4m)

 

 

V+ V1 + H + H1 + H2 = 36’ MAX. (10.9)

V+ V1 + H + H1 + H2 = 36’ MAX. (10.9)

 

 

H + H1 + H2 = 12’ MAX. (3.6m)

H + H1 + H2 = 8’ MAX. (2.4m)

 

 

Figure 15. Flueing with three 90° elbows

 

 

 

 

 

 

 

Heat & Glo • PIER/ST/L&RCOR-HVB-CE2068-900 Rev. H • 6/07

 

25

Image 25
Contents 0087 Safety and Warning Information Table of Contents PIER-HVB-CE PIER-HVB-CE NG, LP Exploded Parts DiagramST-HVB-CE ST-HVB-CE LCOR-HVB-CE LCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE Í Valve AssemblyPre-install Preparation Installation RegulationsAppliance Certification CertificationHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Diagram of the PIER-HVB-CEDiagram of the ST-HVB-CE Diagram of the LCOR-HVB-CE and RCOR-HVB-CE Locating the Fireplace Fireplace Dimensions and LocationsFraming the Fireplace Clearance RequirementsModel AT Each Joint Flue System Approvals Installing the Flue SystemIdentifying Flue Components Terminations KitsMax. Run Straight OUT HorizontalflueingFlueing with One 90 Elbow Flueing with Two 90 Elbows Propane / Butane Flueing with TWO 90 Elbows Flueing with three 90 elbows + H1 FT + V1 FT Attach the First Flue Component to the Starting Collars Installing Flue ComponentsContinue Adding Flue Components Install Support BracketsCombustibles inside the framed firestop opening Trapezoid Termination Cap Ceiling Firestop Ceiling SideMinimum Height from Roof to Lowest Discharge Opening Vent Termination Minimum Clearances Gas Control System Positioning, Leveling, and Securing the FireplaceSecuring of a Fireplace Gas Pressure Requirements Gas Supply LineNatural Gas Optional Accessories Wiring the FireplaceWall Switch FinishingLog placement Installing Trim, Logs & Ember MaterialInstalling the Trim Attachment of Lower Door AssemblyHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Only for Model LCOR-HVB-CE 3 4Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Double-check for faulty components After the InstallationBefore Lighting the Fireplace Lighting the FireplaceCleaning Glass Door Fireplace MaintenanceReplacing old ember material Checking Flame Patterns, Flame Height5Troubleshooting Be Placed in this Opening Troubleshooting